7502 3 AVENUE, Brooklyn, NY, 11209 · New York City · 17 total events
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Facade repairs as per plans filed herewith. No change to use, egress or occupancy
REAPLACEMENT OF 4 TON CAPACITY WATER SOURCE HEAT PUMP UNIT ON THE 29TH FLOOR. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
ACS - Mechanical modification and installations in conjunction with office space build-out 30th floor per plans filed herewith. No change to use, egress or occupancy.
ACS - Mechanical modification and installation in conjunction with office space build-out floors 26-28 as per plans filed herewith. No change to use, egress or occupancy.
Install hose valve cabinet on the 30th floor with related standpipe piping modifications; connect to existing system. Remove one hose valve; cap line.
Installation of fire hose valve cabinet on floors 27 & 28 with related standpipe piping modifications; connect to existing system. Remove 1 FHV from each floor, cap lines.
ACS - Installation of plumbing fixtures in conjunction with office space build-out floors 26-28 as per plans filed herewith.
ACS - Installation of plumbing fixtures in conjunction with office space build-out 30th floor as per plans filed herewith.
ACS - installation of sprinkler heads in conjunction with office space build-out floors 26-28 as per plans filed herewith; connect to existing system.
ACS - Installation of sprinkler heads in conjunction with office space build-out 30th floor as per plans filed herewith; connect to existing system.
Plumbing modifications related to core bathroom renovations.
Floors 26-38 & 30 - Remove plumbing fixtures and piping; cap lines per plans filed herewith.
Floors 26-28 & 30 - Remove sprinkler heads and piping as per plans filed; install TCSP as required. Remove FHC; cap back to SD riser.
Floors 26-28 & 30 - Remove sprinkler heads and piping as per plans filed; install TCSP as required. Remove FHC; cap back to SD riser.
Floors 26-28 & 30 - Remove mechanical equipment, duct and piping back to existing HVAC for future installation as per plans filed. No change to use, egress or occupancy.