7422 3 AVENUE, Brooklyn, NY, 11209 · New York City · 6 total events
MODIFICATION TO THE EXISTING 7500GALLON FUEL STORAGE SYSTEM AND ASSOCIATED PIPING INCLUDING THE INSTALLATION OFNEW FUEL OIL PUMPS AND FUEL OIL SUPPLY AND RETURN PIPING AS NEEDED TO SUPPORT THENEW EMERGENCY GENERATOR ON THE ROOF.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.THE PIPE SCAFFOLD AT THE NORTHEAST CORNER FROM THE GROUND AND NORTH ELEVATION. FROM THE GROUND PAST THE MAIN ROOF PARAPET WELL.
REMOVE EXISTING 200KW TURBINE GENERATOR AND EXISTING 350KWDIESEL ENGINE ON FIRST FLOOR. REMOVE EXISTING INTERIOR PARTITIONSIN ORDER TO ENLARGE ROOM FOR NEW ELECTRICAL SWITCH GEAR.PROVIDE NEW STEEL ROOF DUNNAGE FOR NEW 800KW ROOFTOPGENERATOR WITH ENCLOSURE
Filing for the installation of new roof top dunnage, new roof framing and new 2nd floor framing.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.