73 10 STREET, Brooklyn, NY, 11215 · New York City · 82 total events
SPRINKLER WORK ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
This Alt MS application is being filed for mechanical duct work in conjunction with the General Construction application. Work to include installation of water source heat pump, new ductwork, air outlets & new hydronic piping.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing for General Construction demising wall as per plans submitted.
GENERAL CONSTRUCTION TAKING PLACE ON FLOORS 1 AND 2 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
STRUCTURAL WORK TAKING PLACE ON FLOORS 1 AND 2 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Temporary Installations to be used on a temporary event McKinsey EOY 2025. All the Installations are to be removed upon completion of the event.
PLUMBING WORK ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
GENERAL CONSTRUCTION ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
MECHANICAL WORK ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Temporary Installations to be used on a temporary event NYC Wine and Food Level 4. All the Installations are to be removed upon completion of the event.
Temporary Installation to be used on a temporary event Light the Night Manhattan 2025. All the Installations are to be removed upon completion of the event.
UPDATE THE SCHEDULE A AND DESIGN DRAWINGS FILED HEREIN.
Temporary Installation to be used on a temporary event Jordan The One. The installation is to be removed upon completion of the event.
Temporary Installation to be used on a temporary event Tennis Activation Seaport Square. The Installation is to be removed upon completion of the event.
This Alt PL is being filed for plumbing work in conjunction with the General Construction application. Work to include installation of plumbing fixtures and sprinkler heads in Space 105.
Installation of temp scaffold, no alt to exist structures for Annual Macy's July 4 Event. TPA not required. Producer responsible to monitor site safety & implement HWAP. Production equipment removed upon event completion
This Alt PL is being filed for plumbing work in conjunction with the General Construction application. Work to include installation of plumbing fixtures and sprinkler heads in Space 105.
Temporary Installations to be used on a temporary event Disney x Old Navy Collab. All the Installations are to be removed upon completion of the event.
INSTALL TEMPORARY TENT ON PIER 17 AT SOUTH STREET SEAPORT, NEW YORK, NY 10038, FOR EVENT ON 05-30-25 THRU 06-01-25. PRODUCER TO MONITOR WEATHER CONDITIONS & IMPLEMENT APPROPRIATE ACTION. NO ALTERATION TO EXISTING STRUCTURES.
Temporary Installations to be used on a temporary event Pier 17 Rooftop Summer Concert Series. All the Installations are to be removed upon completion of the event
Filing for plumbing and sprinkler work related to demising wall.
This Alt GC application is being filed for a renovation of tenant space 105. Work to include removal of existing partitions and glazing, infilling floor & installing new windows and doors. Installing suspended ceiling and partitions.
Temporary Installations to be used on a temporary event Paxos Summit. All the Installations are to be removed upon completion of the event.
Filing for plumbing and sprinkler work related to demising wall.
Temporary Installations to be used on a temporary event McKinsey Co Holiday Gathering, TPA M01146023-I1. All the Installation are to be removed upon completion of the event
Filing for General Construction demo work on 1st and 2nd floors
Temporary Installation to be used on a temporary event. All the Installations are to be removed upon completion of the event.
Temporary Installations to be used on a temporary event Annual ESPN EDGE Conference at Pier 17. All the Installations are to be removed upon completion of the event.
Temporary Installation to be used on a temporary event Light the Night Manhattan . All the Installations are to be removed upon completion of the event.
Install of temp platform, scenic sculpture and prod equip, no alt to exist structures for Valorant. TPA required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete
Temporary Installation to be used on a temporary event PRIDE X CHASE SAPPHIRESTONEWALL FOREVERSCREENING. All the Installations are to be removed upon completion of the event.
Temporary Installations for Pier 17 Rooftop Concert Series 2024 event. All installations shall be removed upon completion of the event,
Temporary Installation to be used on a temporary event Target Wonderland. All the Installations are to be removed upon completion of the event.
Temporary Installation to be used on a temporary event Pier 17 Winter Installation. All the Installations are to be removed upon completion of the event.
Temporary Installation to be used on a temporary event Nike Marathon. All the Installations are to be removed upon completion of the event.
Temporary Installation for the ESPN EDGE Conference event. All the installations are to be removed upon completion of the event.
Temporary Installation, to be used on a temporary event Chef Expo 2023, TPA M00936446-I1. All the Installations are to be removed upon completion of the event.
Temporary Installation to be used on a temporary event Pier 17 Summer Concert Series. All the installations are to be removed upon completion of the event.
Temporary Installation to be used on a temporary eventBCG Summer Seaport Festival. All the installations are to be removed upon completion of the event.
WORK CONFINED TO 3RD FLOOR OF AN EXISTING OFFICE BUILDING. SELECTIVE DEMOLITION AS NOTED. REPAIRS TO CEILING AND PARTITIONS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. NO EXTERIOR SCOPE OF WORK.
Temporary Installation to be used on a temporary event 100 years of wonder. All the installations are to be removed upon completion of the event.
Hereby filing to modify plumbing piping, and install, remove and relocate sprinkler heads with related piping for renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Modify mechanical works and associated piping as shown on drawings filed herewith. No change in use, egress or occupancy.
Hereby filing to modify plumbing piping, and install, remove and relocate sprinkler heads with related piping for renovation as shown on plans filed herewith. No change to use, occupancy or egress.
INTERIOR RENOVATIONS TO INCLUDE INSTALLING NON-BEARING PARTITIONS AND FINISHES AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Temporary Installations to be used on a temporary event, Pier 17 Rooftop Concert Series 2023. All the Installations are to be removed upon completion of the event,
Temporary installation to be used for a temporary event. Installation is to be removed upon completion of the event.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Structural Support Framing for Glass Canopy. Approx. 8 tons of structural steel. No change in use, egress, or occupancy.