710 EAST NEW YORK AVENUE, Brooklyn, NY, 11203 · New York City · 156 total events
Apt 9D — Possession
Apt 10J — P
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE AT 1ST AND 2ND FIRE DOOR FROM NORTH AT EAST AT PUBLIC HALL, 15th STORY
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
APARTMENT ONLY
LANDSCAPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE AT HOPPER DOOR AT PUBLIC HALL, 15th STORY
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE AT 2ND FIRE DOOR FROM NORTH AT EAST AT PUBLIC HALL, 15th STORY
ENTIRE BUILDING
APARTMENT ONLY
LANDSCAPING AS PER PLANS. PAVING OF PATHWAYS & AMENITY SPACES, PLANTING OF TREES, SHRUBS, PERENNIALS & LAWN, FURNISHING OF SEATING, LITTER RECEPTACLES, FITNESS+PLAY EQUIPMENT. REPAIRED&REPLACED FENCING & GATES AS NEEDED NO CHANGE TO USE,EGRESS,OCCUPANCY
LANDSCAPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
WORK SHALL INCLUDE REMOVAL OF PARTITIONS, REPLACEMENT OF FINISHES & FIXTURES, INSTALLATION OF PARTITIONS, AS PER PLANS.
WORK SHALL INCLUDE REMOVAL OF PARTITIONS, REPLACEMENT OF FINISHES & FIXTURES, INSTALLATION OF PARTITIONS, AS PER PLANS.
Suspended scaffold in order to perform exterior facade repairs. Install roof hoist. Facade inspections to be performed. Sidewalk shed filed under separate application. No change in use, occupancy or egress under this application.
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
Installation of plumbing fixtures along with related piping.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Judgment: NO
ENTIRE BUILDING
ENTIRE BUILDING
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 19B, 19th STORY, 5th APARTMENT FROM NORTH AT EAST
Temp sheeting as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER IN THE KITCHEN LOCATED AT APT 7B, 7th STORY, 4th APARTMENT FROM NORTH AT EAST
§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES NO VOLUME IN THE ENTIRE APARTMENT LOCATED AT APT 7B, 7th STORY, 4th APARTMENT FROM NORTH AT EAST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOORS IN THE KITCHEN LOCATED AT APT 7B, 7th STORY, 4th APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER IN THE 1st ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 4th APARTMENT FROM NORTH AT EAST
§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES NO VOLUME IN THE ENTIRE APARTMENT LOCATED AT APT 7B, 7th STORY, 4th APARTMENT FROM NORTH AT EAST
Judgment: NO
ELECTRIC/GAS RANGE
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 7B, 7th STORY, 5th APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER AT NORTH WALL IN THE KITCHEN LOCATED AT APT 7B, 7th STORY, 5th APARTMENT FROM NORTH AT EAST
Judgment: NO
RETROFIT EXISTING IMPERVIOUS SURFACES TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGE STORMWATER RUNOFF FROM TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GI PROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
Installation of plumbing fixtures along with related piping.
WATER SUPPLY
OUTLET/SWITCH
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL COMPOSITE FLOOR TILES AT PUBLIC HALL, 20th STORY
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AND HINGES AT 1ST FIRE DOOR FROM NORTH AT EAST LEADING TO STAIR B AT PUBLIC HALL, 20th STORY
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT 1ST FIRE DOOR FROM NORTH AT EAST LEADING TO STAIR A AT PUBLIC HALL, 1st STORY
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT 1ST FIRE DOOR FROM NORTH AT EAST LEADING TO STAIR B AT PUBLIC HALL, 20th STORY
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT 1ST FIRE DOOR FROM NORTH AT EAST LEADING TO STAIR A AT PUBLIC HALL, 1st STORY
§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WITH FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY
§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AND BOXES AT PUBLIC HALL, 12th STORY
§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AND BOXES AT PUBLIC HALL, 1st STORY
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AT VINYL FLOOR TILES AT PUBLIC HALL, 12th STORY
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM