Filing herewith for HVAC modifications (IC-23-701)
INTERIOR RENOVATION AT FIRST FLOOR AS PER PLANS FILED HEREWITH
EXTERIOR ADA RAMP AND VEHICLE RAMP INSTALLATION AT FIRST FLOOR AS PER PLANS FILED HEREWITH
Filing herewith for installation of AC unit (IC-23-703)
PLUMBING WORK AT 3RD FLOOR AS PER PLANS FILED HEREWITH
INTERIOR RENOVATION AT 3RD FLOOR AS PER PLANS FILED HEREWITH
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING GENESIS
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING GENESIS WITH LOGO
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING GENESIS OF BROOKLYN
Filing herewith for installation of HVAC equipment (IC-22-302)
STRUCTURAL WORK FOR EXTERIOR ADA AND VEHICLE RAMPS AT FIRST FLOOR AS PER PLANS FILED HEREWITH
MECHANICAL WORK AT 1ST FLOOR AS PER PLANS FILED HEREWITH
NEW WET SPRINKLER SYSTEM AT 1ST FLOOR AS PER PLANS FILED HEREWITH
PLUMBING WORK AT 1ST FLOOR AS PER PLANS FILED HEREWITH
Building up elevation of slab in lobby and addition of a new exterior pedestrian ramp at entrance
Filing herewith for installation of HVAC equipment (IC-23-316)
Installation of a new roll gate existing facade wall; Lowering 2 areas of raised interior slab on grade to street level and construction of a built up concrete ramp;reconstruction of damaged slab on grade and installation of 2 short run exterior stairs.
PARTIAL INTERIOR RENOVATION AND FACADE RENOVATION AT 1ST FLOOR OF EXISTING 6 STORY BUILDING WITH CELLAR.
FILE PARTIAL INTERIOR RENOVATION AT 1ST FLOOR OF EXISTING 6 STORY BUILDING WITH CELLAR. NEW EXTERIOR ADA RAMP AND STAIRS. EXISTING SPRINKLER SYSTEM TO REMAIN (NO CHANGE). NO CHANGE IN OCCUPANCY, USE AND EGRESS, NO INCREASE IN BULK.
Filing herewith for installation of HVAC equipment.
Herewith filing for Facade repairs as per details on plans. No change in use, egress or occupancy with this filing.
NEW PLUMBING FIXTURES IN CONJUNCTION WITH DOB NOW #B08024040-I1
PARTIAL INTERIOR RENOVATION AT 3RD FLOOR OF EXISTING 8 STORY BUILDING WITH CELLAR - Unit 22-307
Interior Partition work on 4th floor tenant buildout unit #23-4 SE
Filing Plumbing Fixture in conjunction with job number B00732575-I1
SPRINKLER WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
PL WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION
interior renovation of 4th floor.
Filing herewith for installation of HVAC equipment
DECOMMISSION OF EXISTING NEXTEL TELECOM SITE. REMOVE ALL ANTENNAS AND EQUIPMENT FROM THE ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ORIGINAL INSTALLATION APPROVED UNDER APPLICATION #301231209
FILING HEREWITH FOR STRUCTURAL WORK RELATED TO RAMP INSTALLATION. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.
PROPOSED PARTIAL INTERIOR RENOVATION AT 4TH FLOOR OF EXISTING 8 STORY BUILDING
Installation of new plumbing fixtures.
GC work as per plans. No change to use egress or occupancy on this application
FIILING HEREWITH FOR MH WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION
Filing herewith for installation of HVAC equipment (22-403)
Mechaincalvent installation at partial 6th floor as per plans filed herewith.
INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS FILED HEREWITH.
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN NO CHANGE IN USE, OCCUPANCY OF EGRESS UNDER THIS APPLICATION.