Filing herewith non structural interior Demolition applications for the removal of the interior Sprinkler and Standpipe system prior to demolition. No change to use, egress, or occupancy.
Install plywood construction fence for demolition operations
removal of mechanical equipment and associated ductwork as per plans filed. no change in use egress or occupancy
plumbing removals as per plans filed
remove interior partitions and finishes as per plans filed. no change in use egress or occupancy
temporary shoring as per plans filed
ENTIRE BUILDING
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
PROVIDE SPRINKLER COVERAGE UNDER AREAS OF OBSTRUCTED COVERAGE DUE TO INSTALLATION OF NEW EQUIPMENT. NO CHANGE TO USE, OCCUPANCY OR EGRESS
PLUMBING WORK AS PER PLANS FILED. FILED IN CONJUNCTION WITH NEW BUILDING #321592503
CIVIL WORK FILED IN CONJUNCTION WITH NB #321592503. Adding Special Inspections
mechanical filing as per plans filed
SPRINKLER WORK AS PER PLANS FILED. FILED IN CONJUNCTION WITH NEW BUILDING #321592503
installation of material handling system in existing warehouse as per plans filed
INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
STRUCTURAL WORK AS PER PLANS FILED. FILED IN CONJUNCTION WITH NEW BUILDING #321592503
Site Grading as per plans filed
PLUMBING WORK AS PER PLANS FILED. FILED IN CONJUNCTION WITH NEW BUILDING #321592503
STANDPIPE WORK AS PER PLANS FILED. FILED IN CONJUNCTION WITH NEW BUILDING #321592503
installation of site storm drainage system as per plans filed
FILING HEREWITH INSTALLATION OF 25' CURB CUT WITH TWO 2'-5 SPLAYS LOCATED ON THE 19TH STREET. NO CHANGE IN USE EGRESS OR OCCUPANCY
install storm water piping as per plans filed
Fuel storage filed for emergency generator
MECHANICAL WORK AS PER PLANS FILED. FILED IN CONJUNCTION WITH NEW BUILDING #321592503
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Install standpipe system as per plans filed. no change in use egress or occupancy
ENTIRE BUILDING
Underground plumbing as per plans filed herewith. Filed in conjunction with New Building application #321592503.
Removal of slabs at grade in preparation for future construction. No change in use egress or occupancy.
PLUMBING SITE WORK FILED IN CONJUNCTION WITH NEW BUILDING #321592503
Install sprinkler system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB#321592503
Provide support of excavation work per plans filed herewith
PLUMBING SITE WORK FILED IN CONJUNCTION WITH NEW BUILDING #321592503
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
installation of construction fence to protect site during full demolition.
Install plywood construction fence to protect site during full demolition operations under application #322036444
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
installation of construction fence for property located at 4 19th St, to protect site during full demolition.
INSTALLATION OF SACRIFICIAL DRIVEN AND DRILLED TEST PILES AS PER PLANS.
INSTALLATION OF SACRIFICIAL TEST PILES AS PER PLANS.
Install plywood construction fence to protect site during full demolition operations under applications #322086194 and #322086229