595 4 STREET, Brooklyn, NY, 11215 · New York City · 12 total events
INSTALLATION OF TEMPORARY BETA MAX AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE BETA HOIST IS ATTACHED TO THE CEILING OF THE SIDEWALK SHED AT 30TH STREET ELEVATION..
INSTALLATION OF TEMPORARY SYSTEM SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SYSTEM SCAFFOLD STARTS FROM THE GROUND FLOOR OF THE FRONT BUILDING ON 30TH STREET.
Structural modifications in a commercial building as per plans filed. No change in use, egress or occupancy.
Filing removal and replace of existing generators located within the cellar and roof and cellar switchgear with one new 750KW diesel generator and switchgear on the second floor and new battery room on the first floor and includes new partitions.
Filing for mechanical modifications in a commercial space. No change of use, egress or occupancy.
Installation of sidewalk shed as indicated on the attcahed drawings. There are no changes in use, egreess or occupancy.
Installation of temporary plastic barriers with chain link fence and reflectors on top as indicated on the attached drawings. There are no changes in use, egress or occupancy.
Miscellaneous general construction, protection, dunnage framing and roof removal related to the ac unit replacement on the 1st floor and Roof.
INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Replacement of AC coil inside existing First Floor Air Handling Unit and associated Air-cooled Condesnising Units located on the Roof
NEW LOW PRESSURE GAS SERVICE WITH RELEVANT PIPING FOR NEW BOILER
REPLACE EXISTING BOILER AS PER PLANS