5803 2 AVENUE, Brooklyn, NY, 11220 · New York City · 43 total events
work includes per the filed plans remove/replace existing roof membrane and flashing, parapet replacement, remove/replace cracked/spalled masonry units, sealant replacement, remove/replace steel lintels, repair spalled concrete, install guard rails,
work includes per the filed plans remove/replace existing roof membrane and flashing, parapet replacement, remove/replace cracked/spalled masonry units, sealant replacement, remove/replace steel lintels, repair spalled concrete, install guard rails,
ENTIRE BUILDING
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
Existing roof removal, partial existing parapet removal, installation new roof assembly/flashing, new masonry parapet, stone/metal coping option, remove and replace existing roof drains, parapet lights, electrical work assoc mech equipmt, firestopping.
MS- Removal of two (2) existing air cooled split system and replaced with Two (2) new air cooled split systems. Removal of two (2) existing exhaust fans serving laboratory hoods and replaced with Two (2) new exhaust fans. OT - scope of work in comments.
REGISTER GAS BOILER.
REGISTER DOMESTIC HOT WATER BOILER.
TEST/REPAIR GAS RISERS.
FULL STAIRCASE REPLACEMENT AT WESTERN & EASTERNSIDES OF SMITH AUDITORIUM & CHAPEL BUILDING, MANHATTAN COLLEGE.
FULL STAIRCASE REPLACEMENT AT WESTERN & EASTERNSIDES OF SMITH AUDITORIUM & CHAPEL BUILDING, MANHATTAN COLLEGE.
FULL STAIRCASE REPLACEMENT AT WESTERN & EASTERNSIDES OF SMITH AUDITORIUM & CHAPEL BUILDING, MANHATTAN COLLEGE.
FULL STAIRCASE REPLACEMENT AT WESTERN & EASTERNSIDES OF SMITH AUDITORIUM & CHAPEL BUILDING, MANHATTAN COLLEGE.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
PESTS
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Remove Four (4) Existing Roof Drains and Install Four (4) New 4 Roof drains. Remove and replace existing storm leaders up to and including first elbow.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION, AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION, AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HAYDEN HALL- HEREWITH FILING FOR EXISTING FOUNDATION WALL REPAIR. NO CHANGE TO USE, EGRESS OR OCCUPANCY TO THIS APPLICATION.
ENTIRE BUILDING
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
SH/Manhattan college Delasalle Chapel- FOR TEMPORARY CONSTRUCTION EQUIPMENT(SHED) SUBMITTING ON BEHALF OF CONTRACTOR, NO CHANGE IN USE, OCCUPANCY OR EGRESS
SF/Manhattan college Delasalle Chapel- FOR TEMPORARY CONSTRUCTION EQUIPMENT(SCAFFOLD) SUBMITTING ON BEHALF OF CONTRACTOR, NO CHANGE IN USE, OCCUPANCY OR EGRESS
EMERGENCY REPAIRS OF COMPROMISED MASONRY PARAPET ALONG THE SOUTH ELEVATION OF THOMAS HALL. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Filing for temporary supported scaffolding. No change in use or egress or occupancy.
Filing for temporary emergency sidewalk shed. No change in use or egress or occupancy.
Remove and repair bathroom water piping and reinstall existing fixtures in same location.
Installation of Mechanical HVAC units, exhaust fans, ductwork and all related piping.
CHRYSOSTOM HALL- INTERIOR REMODEL OF THE EXISTING PUBLIC CORRIDOR. PATCH AND PAINT CEILINGS AS NECESSARY THROUGHOUT.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
INSTALLATION OF TEMPORARY ANCHORING FOR SUSPENDED PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH
Modification to plumbing system as per plans filed herewith. No change in use, egress, or occupancy under this application.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019