563 1 STREET, Brooklyn, NY, 11215 · New York City · 63 total events
Installation of outriggers for facade repair and inspection
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALLING ONE (1) NEW COOKING APPLIANCE IN EXISTING COMMERCIAL KITCHEN OF EXISTING RESTAURANT. NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Facade Inspection. Designated Primary Site supervisor: Jesus Decola
Installation of HVAC system, ventilation system, kitchen exhaust and associated ducts/piping.
The Alt GC application is being filed for the interior renovation of a portion of the 1st floor and cellar in a commercial building. Work to include partitions, doors, fin floor, ceiling, millwork. No change in use, egress or occupancy
MECHANICAL WORK TO PROVIDE NEW SUPPLEMENTAL AC FOR IT ROOM. PROVIDE NEW PIPINGFROM MECHANICAL FLOOR AND MODIFY DUCTWORK WITHIN CONFERENCE ROOM.
Facade Inspection. Designated Primary Site supervisor: Jesus Decola
General construction filing for Facade repairs as per plans herewith, No change to use, egress, or occupancy.
Plumbing work for restaurant fit out. Work to include installation of water and gas fixtures in the cellar and 1st floor.
Plumbing work for restaurant fit out. Work to include installation of water and gas fixtures in the cellar and 1st floor.
Modification of existing sprinkler system, No change to use, egress, or occupancy.
Modification of existing plumbing fixtures and related piping for office pantry. No change to use, egress, or occupancy.
General Construction for Installation of walls, doors, floor finishes and ceilings. No change to use, egress, or occupancy.
Mechanical Buildout for removal and Installation of duct work, diffusers, fans, and related mechanical piping.
Installation of new convenience stair from cellar to 1st floor and opening of ductwork for mechanical equipment from cellar to 1st floor.
Modification of existing sprinkler systems.
Relocation of existing sprinkler heads to new location to provide sufficient coverage as per plans filed herewith.
14th and 15th floors Interior renovation of commercial space, remove and install walls, doors, floor finishes and ceilings as per plans.
SPRINKLER SYSTEM INSTALLATION AS PER PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Plumbing modifications to related piping as per plans, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Replace and relocate plumbing fixtures as per plans.
INTERIOR RENOVATION WORK IN COMMERCIAL OFFICE SPACE TO INCLUDE CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, AND CEILINGS AS SHOWN ON PLANS. NO CHANGE OF USE OR OCCUPANCY. NO CHANGE OF EGRESS.
INSTALLATION OF WALLS, DOORS, FLOORFINISHES & CEILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Installation of mechanical duct work, diffusers and related mechanical piping as per plans. No Change to Use, Egress or Occupancy.
Removal of new plumbing fixtures and related piping and related piping as per plans.
New mechanical duct layout, new diffusers and related piping as per plans.
MODIFICATION TO SPRINKLER SYSTEM AS PER PLANS HEREWITH, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION WORK IN COMMERCIAL OFFICE SPACE TO INCLUDE CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, AND CEILINGS AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
MODIFICATION OF EXISTING DUCTWORK. INSTALLATION OF NEW DUCTWORK, DIFFUSERS, CONTROLS, ACCESSORIES, AND INSTALLATION OF AC UNIT.
Modification of existing sprinkler systems.
Interior installation of walls, doors floor finishes and ceilings, NO CHANGE IN USE, EGRESS OR OCCUPANCY
Plumbing modifications to related piping as per plans.
Removal and installation of mechanical duct work, diffusers and related mechanical piping. No Change to Use, Egress or Occupancy.
Modification of mechanical systems as per plans filed herewith. No change in use, occupancy or egress.
REMOVE ALL EXISTING PLUMBING FIXTURES ON THE 4TH AND 6TH FLOOR.
Interior Demo for Mechanical Systems.
Interior demo, NO CHANGE IN USE, EGRESS OR OCCUPANCY
Removal of existing sprinkler system. Install new temp sprinkler loop. NO change in use, egress or occupancy.
Removal and installation of mechanical duct work, ceiling diffusers and related mechanical piping.
Installation of new walls and doors minor hung ceiling work.
Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
New mechanical duct work, ceiling diffusers, A/C unit and related piping.
Slab opening between the 13th and 14th floors as per plans filed herewith No Change to Use, Egress or Occupancy.
Installation of walls , doors, floor finishes and ceilings as per plans, no change in use, egress, occupancy.
Interior demolition of non-bearing partitions and related finishes with plans filed herewith. No change in use, egress or occupancy.
14th and 15th floors - modification of existing sprinkler system as per plans
Removal of new plumbing fixtures and related piping and related piping as per plans.
14th and 15th floors - New mechanical duct layout, new diffusers and related piping as per plans.
New mechanical duct layout, new diffusers and new unit as per plans