555 WYTHE AVENUE, Brooklyn, NY, 11249 · New York City · 405 total events
ENTIRE BUILDING
ENTIRE BUILDING
DOOR
MOLD
FLOOR
PESTS
ENTIRE BUILDING
ENTIRE BUILDING
GARBAGE/RECYCLING STORAGE
ENTIRE BUILDING
ENTIRE BUILDING
APARTMENT ONLY
DOOR
ENTIRE BUILDING
Apt 3D — Possession
DOOR FRAME
DOOR
DOOR
SLOW LEAK
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
DOOR
ENTIRE BUILDING
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
APARTMENT ONLY
APARTMENT ONLY
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT. AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 4M, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
PESTS
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST, THE FOYER LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION SYSTEM AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
CEILING
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
REFRIGERATOR
ELECTRIC/GAS RANGE
GARBAGE/RECYCLING STORAGE
DOOR
WATER SUPPLY
WATER SUPPLY
MAINTENANCE
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
DOOR
GARBAGE/RECYCLING STORAGE
ENTIRE BUILDING
ENTIRE BUILDING