545 6 AVENUE, Brooklyn, NY, 11215 · New York City · 35 total events
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK
STORAGE ON SIDEWALK SHED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
NYU Exterior Facade repairs as per the plans filed including: Removal and replacement of cracked brick masonry units. Brick masonry re-pointing. Stone spall and crack repairs, patching and coating. Cornice repairs & install new GFRC cornice.
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of suspended scaffold for facade work or inspection
INSTALL BRACKETS FOR CHIMNEY EXTENSIONS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
FILING HEREWITH TO INSTALL INTERIOR PARTITIONS, DOORS AND CEILING ON THE 8TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FILING HEREWITH TO INSTALL NEW DOOR ON 8TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
MODIFICATION OF MECHANICAL DUCTWORK ON 2ND FLOOR AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
exterior restoration
MODIFICATIN OF EXISTIGN SPRINKKLER SYSTEM ON 2ND FLOOR AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FILING FOR INTERIOR PARTITION MODIFICATION, DOORS, AND CEILING ON SECOND LEVEL AS PER PLAN BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
Installation of mechanical system as shown on drawings. No change to use, egress or occupancy.
FILING FOR INTERIOR PARTITION MODIFICATION, DOORS, AND CEILING ON CELLAR, FIRST AND SECOND LEVEL AS PER PLAN BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF FENCE ON BROADWAY AS PER PLANS SUBMITTED. FENCE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
INSTALLATION AND USE OF EMERGENCY SCAFFOLD STAIR TOWER ON BROADWAY AS PER PLANS SUBMITTED. EMERGENCY SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
INSTALLATION AND USE OF SIDEWALK SHED ON BROADWAY AS PER PLANS SUBMITTED.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
INSTALLATION OF NEEDLE BEAM SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ELECTRIC/GAS RANGE
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
ENTIRE BUILDING
INSTALLATION OF SIDEWALK SHED AND CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF SIDEWALK SHED AND CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF SUPPORT SCAFFOLD IN ACCORDANCE WITH NYCC 14 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF TEMPORARY FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF A SCAFFOLD STAIR TOWER AS PER DRAWINGS. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF MOCK-UP SCAFFOLD AS PER DRAWINGS. MOCK-UP SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS.