46 1 PLACE, Brooklyn, NY, 11231 · New York City · 74 total events
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTSSHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THISAPPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.THE PIPE SCAFFOLD IN THE SHAFT FROM THE CELLAR TO THE 22ND FLOOR
Modification/additions to existing combined sprinkler/standpipe system, including new automatic fire pump, jockey pump and related piping.
INSTALLATION OF NEW TEMPORARY DRY MANUAL STANDPIPE SYSTEM WITH AIR COMPRESSOR AND SUPERVISORY ALARM SYSTEM FOR EXISTING BUILDING RENOVATION AND PARTIAL RESIDENTIAL CONVERSION AS PER PLANS FILED HEREWITH.
Modification/additions to existing combined sprinkler/standpipe system, including new automatic fire pump, jockey pump and related piping.
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PLYWOOD FENCE IS ATTACHED TO THE SIDEWALK SHED COLUMNS AT BROADWAY ELEVATION.
Extent, Sequence, Means and methods for the proposed partial demolition. Refer to comments section for phased scope of work.
Modification/additions to existing HVAC system and related ductwork/piping. No change in use, egress or occupancy under this application.
Removal of existing finishes and construction of new gas meter room as per plans filed herewith. No change in use, egress or occupancy under this application.
INSTALLATION OF TEMPORARY BARRIER AS PER PLAN. NO CHANGE IN USE,EGRESS,OR OCCUPANCY. THE BARRICADE AT BROADWAY ELEVATION.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.THE ROOF PROTECTION AT EAST NEIGHBOR'S 17TH/24TH FLOOR SETBACK. THE ROOF PROTECTION AT THE NORTH NEIGHBOR'S MIDDLE COURTYARD ROOF /MAIN ROOF.
INSTALLATION OF TEMPORARY SYSTEM STAIR AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SYSTEM STAIR SHAFT #3/#4 FROM THE CELLAR LEVEL SLAB TO THE 1ST FLOOR.
INSTALLATION OF TEMPORARY BETA HOIST AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE BETA HOIST IS INSIDE THE ELEVATOR MACHINE ROOM ATTACHED TO THE EXISTING I BEAM.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.. THE PS FROM THE 3RD FL TO THE 8TH FL, NEW 9TH FL SLAB TO THE TOP OF THE BUILDING. THE PS TOP OF THE NB SYSTEM AT THE 8TH FL TO THE TOP OF THE BUILDING AT THE NE
INSTALLATION OF TEMPORARY NEEDLE BEAM WITH PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.THE NEEDLE BEAM WITH PIPE SCAFFOLD AT THE B1/B3 ELEVATOR SHAFT FROM THE 8TH FLOOR SLAB TO THE 10TH FLOOR SLAB.
REPLACEMENT OF (3) EXISTING WATER-SOURCED AC UNITS WITH (3) WATER-SOURCED HEAT PUMPS ON GROUND FLOOR OF EXISTING BANK .EXISTING DUCTWORK, CONDENSER WATER PIPING AND CONDENSATE DRAIN LINES TO REMAIN.
Modification/additions to existing plumbing fixtures and related piping for proposed partial conversion of commercial space to residential use.
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY.
Alteration-CO filed for the partial conversion of commercial building to a mixed-use building. Residential conversion proposed on the 8th thru 21st floors only. Refer to comments for additional information.
Modification/additions to existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress, or occupancy under this application.
Modification/additions to existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress, or occupancy under this application.
Modification/additions to existing sprinkler system and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification/additions to existing sprinkler system and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of HVAC ductwork, registers/diffusers, VAV boxes and electric unit heater as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of HVAC ductwork, registers/diffusers, VAV boxes and electric unit heater as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of interior non-load bearing partitions, doors/frames, flooring, ceilings and finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of interior non-load bearing partitions, doors/frames, flooring, ceilings and finishes as per plans filed herewith. No change in use, egress or occupancy under this application. Refer to comments section for additional information.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED IS AT BROADWAY AND WALL STREET ELEVATIONS.
Removal of existing HVAC ductwork and registers as per plans filed herewith. No change in use, egress or occupancy under this application.
Removal of interior non-load bearing partitions, doors/frames, flooring, ceilings and finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Modifications to sprinkler system. No change to use, egress, or occupancy.
Filing herewith plans for plumbing work and modifications associated with the demise of an existing TD bank with a new interior fit-out. No change to use, egress, or occupancy.
Plans filed herewith for the interior alteration to existing bank to be demised with a new complete interior fit-out. No change to use, egress, or occupancy, under this application.
Hereby filing plans for the modification to the associated duct work and piping. No change in use, egress, or occupancy.
Hereby filing structural application for structural work associated with the demise of an existing bank space with a new interior fit-out. No change to use, egress, or occupancy.
ERECT FACE REPLACEMENT ON EXISTING NON-CONFORMING ACCESSORY BUSINESS SIGN (BIS #110355277); COPY READING TD BANK
ERECT FACE REPLACEMENT ON EXISTING NON-CONFORMING ACCESSORY BUSINESS SIGN (BIS #110355286); COPY READING TD BANK
Modification of Verizon site. Install 6 new antenna, install 3 new RRHs, install 2 microwave dishes and replace 6 RRH units on the roof. Install 1 cabinet on existing steel dunnage on roof.
Facade restoration and setback roof repair. No change in egress, use or occupancy.
Facade restoration and setback roof repair. No change in egress, use or occupancy.
Modifications to existing plumbing and sprinkler scope. No change of use, egress or occupancy
Modifications to existing plumbing and sprinkler scope. No change of use, egress or occupancy
Modifications to existing HVAC system as per plans filed herewith. No change in use, egress of occupancy under this application.
Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application
Steel framed concrete metal deck slab stair infills on floors 14-18. No change in us, egress or occupancy.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Replace Water-cooled air conditioning equipment on floors 3, 5, 7 with New. Units on 5, 7 floor have steam heat coils
Install sprinkler system as per plans.