4530 1 AVENUE, Brooklyn, NY, 11232 · New York City · 12 total events
Chiller replacement. Air condensing unit replacement.
Supported Scaffolding Installation
Replac exist (7) roof drains. relocate exist (4) vent stack & extend 4' above finished roof. Power flush, clean & test new vent stack. Power flush & clean entire storm drains system, all leaders & storm drain piping.
New Storm-water sewer work from the existing detention tank that is routed through the site. Work includes replacing the storm sewer connection to the city sewer in Autumn Avenue and associated sitework.
Chute Installation
Replace concrete stairs. Provide parapet reinforcement and Concrete slab.
Replace concrete stairs.
Selective remov parapets, brick, masonry, Limestone, Terracotta, roof assembly, concreate & Misc. const. Replac of concrete stair & parapet. Brick Masonry replac & repointing. Replac Roofing assembly, flashing &patching. Ceiling & walls finishes replac.
Sidewalk Shed Installation
Temporary Construction Fence Installation
SH/PS 224K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(Emergency SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW# 115723 NO CHANGE IN USE, OCCUPANCY OR EGRESS
ENTIRE BUILDING