4 4 PLACE, Brooklyn, NY, 11231 · New York City · 8 total events
Remove and replace existing vent flue and associated accessories, provide temp. electric water heater with related piping and temp. pumps, provide chimney drain, electric trap for chimney drain.
installation of supported scaffolding to perform work on facade and roof
Installation of temporary construction fence to perform work around school building and to protect the public.
Modify existing masonry opening within existing brick chimney to install new breeching duct as per mechanical drawings. patch repair existing concrete slab at place of existing equipment removals is boiler room. install new guardrail railings.
Modify existing masonry opening within existing brick chimney to install new breeching duct as per mechanical drawings. patch repair existing concrete slab at place of existing equipment removals is boiler room. install new guardrail railings.
General provisions for heating, air conditioning and ventilation: Replacement of boiler breeching and installation of new chimney liner and draft inducer, smoke test and start-up services and operating and maintenance instructions.
JHS 172Q, INSTALLATION OF SUPPORTED SCAFFOLD AND STAIR TOWER TO ACCESS THE EXISTING MASONRY CHIMNEY TOP TO INSTALL NEW CHIMNEY LINER/S SUBMITTING ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB # Q01110919. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of sidewalk shed around school building to protect the public.