330 HOWARD AVENUE, Brooklyn, NY, 11233 · New York City · 39 total events
VENTILATION SYSTEM
FLOOR
STEAM PIPE/RISER
APARTMENT ONLY
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1A LOWER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1A LOWER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLER AT BOILER ROOM
APARTMENT ONLY
DOOR
Judgment: NO
ENTIRE BUILDING
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
APARTMENT ONLY
APARTMENT ONLY
ENTIRE BUILDING
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED TO CELLAR AT BOILER ROOM
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
ENTIRE BUILDING
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT PUBLIC HALL AT BOILER ROOM, 1st STORY
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Facade repairs. No change in egress, use or occupancy.
ENTIRE BUILDING
APARTMENT ONLY
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
Installation of plumbing fixtures along with related piping.
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
Suspended scaffold in order to perform exterior facade repairs. Facade inspections to be performed. Roof hoist installed. Sidewalk shed filed under separate application. No change in use, occupancy or egress under this application.
PESTS
INSTALL DEBRIS CHUTE AS PER PLANS IN ORDER TO PERFORM FACADE REPAIR. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 334 HOWARD AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 334 HOWARD AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.