33 4 STREET, Brooklyn, NY, 11231 · New York City · 12 total events
FILING GC/ST FOR MINIOR ALTERATIONS TO BUILDING INTERIOR AND WAALL/FLOOR PROTECTION IN AREAS OF WORK. PREPARE EXISTING 2ND FLOOR NETWORK SPACE FOR NEW UT2.0 NETWORK EQUIPMENT WITH COLD-AISLE CONTAINMENT AND IN-ROW COOLING. TOTAL AREA SF: GC=1,750 , ST=500
FILING MS FOR PREPARATION OF EXISTING 2ND FLOOR SPACE FOR NEW NETOWRK EQUIPMENT WITH COLD-AISLE CONTAINMENT AND IN-ROW COOLING
INTERIOR RENOVATION WORK RELATED TO THE CONSTRUCTION OF ATS (AUTOMATIC TRANSFER SWITCH) CLOSET AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
GENERAL CONSTRUCTION WORK RELATED TO THE REMOVAL & INSTALLATION OF NEW SERVICE SWITCHGEAR ON THE 1ST & 2ND FLOOR. SCOPE INCLUDES NEW PARTITIONS, CURBS, AND ASSOCIATED FINISHES.
MECHANICAL WORK RELATING TO THE SWITCHGEAR SERVICE REPLACEMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Structural framing for Switchgear room. No change to use egress or occupancy.
Filing Mechanical in relation to local law 97 upgrades as shown on drawings submitted herewith. No change in use, egress or occupancy.
Filing general construction in relation to local law 97 upgrades as shown on plans submitted herewith. No change in use, egress or occupancy.
Replacement of 2 A/C systems that serve the 2nd Floor FTTP Switchroom. System Components are located inside the MER and on the Roof
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
General Construction work related to the replacement of two (2) A/C systems that serve the 2nd floor FTTP Switchroom. System components are located inside the MER and the roof.
Replacement of HVAC equipment