STRUCTURAL MODIFICATIONS FOR NEW STEEL FRAMING AT 5TH FL, ROOF LEVEL, AND WALL OPENING FOR EXHAUST DUCTWORK INCLUDING LIMITED CONCRETE INFIL OF MINOR EXISTING MEP PENATRATIONS AT ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Application filed for the removal and replacement of two Gas fired water heaters with 5 Electric water heaters located in penthouse level as per plan.
Partial Demolition/ Renovation of 8th floor and additional enabling work on Cellar, 1st, 3rd, 4th, 5th, 7th and roof as shown on plans filed herewith. Filed in conjunction with subsequent MS, PL, SP/SD applications. No change in egress, occupancy, or use
Interior Renovation of the 8th Floor for installation of temporary core sprinkler protection with (11) sprinkler heads.
EXISTING STEEL REINFORCEMENT FOR EXTERIOR PANEL INSTALLATION FROM THE 3 RD FLOOR LEVEL TO THE ROOF AS INDICATED ON PLANS SUBMITTED HEREWITH.
Modifications to existing sprinkler system including the installation of temporary sprinkler loop and relocation of standpipe and auxiliary hose valve in lab space. No change in use, egress or occupancy.
Modifications to existing sprinkler system including the installation of temporary sprinkler loop and relocation of standpipe and auxiliary hose valve in lab space. No change in use, egress or occupancy.
Interior Renovation of the 5th Floor for installation of temporary core sprinkler protection with 35 amount of heads.
Removal of ducts and CHWS&R/HWS&R piping on the 5th floor, removal of AHU and associated ducts and piping on the Roof to accommodate new mechanical equipment on Roof and related ducts and piping on 5th Fl.. no change in use, egress or occupancy
Removal of plumbing fixtures and associated sanitary/water piping to accommodate all new plumbing fixtures and related piping including medical gas piping modifications as indicated on the plans filed herewith. no change in use, egress or occupancy
Removal of partitions, ceiling and finishes to accommodate the reconstruction of the 5th floor, including roof dunnage and access platform for mechanical equipment and window glazing/sash repairs . No change in use, egress or occupancy.
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
CONSTRUCTION OF AREA OF NEW EXTERIOR CLADDING AT THE BLDG NORTH FACADE WHERE NOW EXPOSED BY DEMO OF ADJACENT BUILDING AND CONSTRUCTION OF A NEW ROOF OVER EXISTING LOADING DOCK, INCLUDING ENCLOSING SECURITY FENCE & LIGHTING. NO CHANGE TO USE EGRESS OR OCC.
Structural modifications to accommodate alterations to the existing loading dock as per plans. no change to use, egress or occupancy.
APARTMENT ONLY
Interior renovation of laboratory space at NYU Tandon school of Engineering. No change in egress, occupancy,or use.
HEREWITH FILING MECHANICAL MODIFICATIONS AS PER PLANS FOR THE TANDON SCHOOL OF ENGINEERING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Herewith Filing Modifications to existing Plumbing and Sprinkler System as per plans. No change in use, egress or occupancy proposed.
Legalization of NEW FREEZER CONDENSING UNITS AND ASSOCIATED REFRIGERANT PIPING TO EXISTING EVAPORATORS AS PER PLANS. No change to use, egress or occupancy
Removal of plumbing fixtures and installation of new in 'virtual Kitchen Area' as shown on drawings submitted herewith.
INSTALLATION OF TEMPORARY CMU WALL INFILL TO SEAL FORMER TUNNEL DOOR THAT WAS CONNECTING 80 JOHNSON STREET, AS PER PLANS FILED HEREWITH. THE PERMANENT CONDITION SHALL BE ADDRESSED UNDER A SEPARATE FILING, B01063146-I1.
Reconfiguration of interior non-bearing partitions in limited area of cafeteria to create a virtual Kitchen Area as shown on drawings submitted herewith.
Removal of sprinkler heads, dry pipe valve and dry piping servicing the loading dock as per the filed plans. No change to use, occupancy or egress.
Reconfiguration of interior non-bearing partitions in limited area of cafeteria as shown on drawings submitted herewith.
Existing Screen Wall Removal as per the plans filed including: Removal, repairs & replacement of spalled concrete & deteriorated reinforcement of exterior walls, remove windows & infill openings, roof drains, steel stair, guardrails & flashing.
STRUCTURAL MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Relocation of Standpipe in open lab space on 5th, 6th, and 7th floors as per shown on plans filed herewith. No change in use, egress or occupancy proposed.
Installation of temporary supported/access scaffold per plan submitted. No change in use, egress and/or occupancy with this application.
NYU Rogers Hall, 3rd Floor Steel Framework Repairs as per the plans filed including Concrete Repairs, Partition Wall Repairs and Spray-Applied Fireproofing.
Herewith Filing Modifications to existing Plumbing and Sprinkler System as per plans. No change in use, egress or occupancy proposed.
Existing Screen Wall Removal as per the plans filed including: Removal, repairs & replacement of spalled concrete & deteriorated reinforcement of exterior walls, remove windows & infill openings, roof drains, steel stair, guardrails & flashing.
Mechanical work as per plans filed herewith. No change in Use, Egress or Occupancy.
plumbing work as per plans filed herewith.
FILING HEREWTIH MECHANICAL REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FILING HEREWITH INTERIOR PARTITION REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
modification of existing sprinkler system as per plans filed herewith.
herewith filing to increase the fire rating of chemical storage room to achieve a 3hr rating throughtout, as per plans
mechanical work as per plans herewith filed.
FILING HEREWITH PLUMBING FIXTURE REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FILING HEREWITH REMOVAL OF EIGHT SPRINKLER HEADS AS PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of temporary supported/access scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.