2953 WEST 21 STREET, Brooklyn, NY, 11224 · New York City · 13 total events
APARTMENT ONLY
SUPPORT OF EXCAVATION (SOE) FOR STORM DETENTION SYSTEM REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
EXTERNAL STORM DETENTION SYSTEM REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Demolish & excavate the concrete floor in wash area of Bay#5. Removal of existing 2500 Gal Ethanol UST & associated piping. Install a broom Truck wash & associated drainage piping within Bay$5. Broom tuck wash consists of Ceiling mountain wash curtains.
INSTALL APPROXIMATELY 400 LINEAR FEET OF 8 FOOT HIGH TEMPORARY PLYWOOD CLAD CONSTRUCTION FENCE ON PAVEMENT IN ACCORDANCE WITH N.Y.C.B.C. SECTION 3307.7
EXCAVATE AND INSTALL THE REQUIRED SUPPORT OF EXCAVATION SYSTEMS TO FACILITATE THE PLUMBING UPGRADES ON SITE. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Demolish & excavate the concrete floor in wash area of Bay#5. Removal of existing 2500 Gal Ethanol UST & associated piping. Install a broom Truck wash & associated drainage piping within Bay$5. Broom tuck wash consists of Ceiling mountain wash curtains.
Install new 32'ft long trench drain, precast catch basin and one (1) underground 2,000-Gallon Oil water separator & associated piping as per plans.
REMOVE FIVE (5) UST SPILL CONTAINERS AND INSTALL FIVE(5) DOUBLE WALL SPILL CONTAINERS ON EXISTING GASOLINE AND B5 BIODIESEL USTS.REMOVE AND REPLACE ALL FUEL PUMPS WITHGASBOY MECHANICAL PUMPS. REMOVE AND REPLACE VEEDERROOT. NO CHANGE TO USE OF EGRESS.
PESTS
INSTALLATION OF TEMPORARY CONSTRUCTION CHAIN LINK FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALLATION OF 8 FT HIGH CONSTRUCTED FENCE OF TIGHT BOARD (PLYWOOD PANELS) WITH 2X4 STUDS AND BRACING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.