Conversion of existing warehouse into new basketball training/fitness facility. Partition, finish and fixture work. New storefront. Plumbing, mechanical, sprinkler, structural all filed separately.
Removal of dry valve and conversion to wet pipe sprinkler system. Minor sprinkler head work. No change to use, egress or occupancy under this application.
Installation at air cooled VRF heat pump systems to provide heating and cooling for building. No change of use, egress or occupancy being filed under this mechanical application.
Safe slope excavation required to remove and replace 1st floor slab on grade at a lower elevation. Safe slope excavation required for interior stair with confinement foundation walls. No change to use, egress or occupancy under this application.
Modifications of existing plumbing systems to include installation of plumbing fixtures. Point of use, electric domestic water heaters, piping distribution and sanitary disposal systems. No change of use egress or occupancy filed under this pl application
Modify existing one-story warehouse structure to accommodate proposed basketball court. No change to use, egress or occupancy filed under this application.
Interior renovation of existing light manufacturing space including demolition of non-load bearing partitions. MEP and structural to be filed separate. Exterior work at elevations as per plans filed herewith.
Remove and replace first floor slab on grade at a lower elevation. Proposed interior stair with confinement foundation walls. No change to use, egress or occupancy under this application.