DELUGE MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Installation of new gravity-fed stormwater retention (drywell type) system and associated overflow pipe to city combined sewer.
Perform work associated with the installation of the Battery Energy Storage System at Con Edison's Brownsville Substation.
Mobile App
Mobile App
Replacement of deluge system for Transformer 4 at Con Edison's Brownsville Substation.
Mobile App
Call
Installation of temporary construction fence for site security during construction as shown on the drawings filed herewith.
Replace FDC & existing underground FDC piping with new above ground 6 piping from the FDC to the fire pump room at Con Edison's Brownsville Substation.
Rebuild concrete transformer pad. Grading as shown. Installation of grounding elements for reactor.
SUPPORT OF EXCAVATION AT CON EDISON'S BROWNSVILLE AS PER DRAWINGS. FILING IN CONJUNCTION WITH STRUCTURAL APPLICATION #B00528984 ON DOB NOW BUILD. NO CHANGE IN USE, EGRESS, AND/OR OCCUPANCY