233 1 STREET, Brooklyn, NY, 11215 · New York City · 26 total events
INSTALLATION OF NEW HVAC UNITS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Plumbing and sprinkler installation in conjunction with office renovation. No change in egress, use or occupancy.
Phase 2 interior non-structural renovation of office space. No change in egress, use or occupancy.
Filing to perform load test at 1st floor at 2 locations as per drawings
Install new fire sprinkler system as per plans
Install new fire sprinkler system as per plans
Installation of pipe scaffolding as indicated on the attcahed drawings. There are no changes in use, egress or occupancy.
Installation of plywood enclosure as indicated on the attached drawings. There are no changes in use, egress or occupancy
Minor general construction alterations on the 1st floor for proposed temporary display window; related work as per plans. No proposed change in building use, egress, or occupancy.
Interior renovation of 2nd floor office space and 3rd floor MDF. No change in egress, use or occupancy.
Mechanical systems installation in conjunction with interior renovation of office space. No change in egress, use or occupancy.
Plumbing work in conjunction with Phase 2 office renovation. No change in egress, use or occupancy.
Mechanical installation in conjunction with Phase 2 office renovation. No change in egress, use or occupancy.
Sprinkler modification in conjunction with Phase 2 office renovation. No change in egress, use or occupancy.
Structural work in conjunction with interior renovation of office. No change in egress, use or occupancy.
Plumbing and sprinkler installation in conjunction with office renovation. No change in egress, use or occupancy.
Plumbing and sprinkler installation in conjunction with office renovation. No change in egress, use or occupancy.
Remove plumbing fixtures, appliances and gas piping. No change to use, occupancy or egress.
REMOVE EXISTING INTERIOR NON-BEARING PARTITIONS AND PORTIONS OF CEILING AT 1ST FLOOR AS SHOWN ON PLANS. PATCH AND MATCH CEILINGS, WALLS AND FLOORS. REMOVE HVAC EQUIPMENT ON THE ROOF AS INDICATED ON PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Interior non-structural demolition of interior partitions in commercial office space. No change of egress, use or occupancy.
PLUMBING LEGALIZATION FILED FOR NEW FIXTURES, RELOCATION, GAS EQUIPMENT AND PIPING REMOVAL. ASSOCIATED APPLICATIONS: 120700553, 120669883, 101739059, 100166721, 100146423, 100131028. NO CHANGE TO OCCUPANCY, USE OR EGRESS.
MODIFY EXISTING SPRINKLER SYSTEM THROUGHOUT. NO CHANGE TO USE, OCCUPANCY OR EGRESS. A PAA IS REQUESTED ON 8/7/2020 TO AMEND THE PLUMBING WORK TYPE SCOPE OF WORK. NO CHANGE TO THE SPRINKLER WORK, PLUMBING ONLY.
INSTALLATION OF HVAC VRF UNITS ON THE ROOF FOR THE 006 FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
MODIFY EXISTING SPRINKLER SYSTEM THROUGHOUT. NO CHANGE TO USE, OCCUPANCY OR EGRESS. A PAA IS REQUESTED ON 8/7/2020 TO AMEND THE PLUMBING WORK TYPE SCOPE OF WORK. NO CHANGE TO THE SPRINKLER WORK, PLUMBING ONLY.
DOCUMENTATION OF HVAC UNITS INCLUDING RELOCATION, REPLACEMENT, REMOVALS AND CORRECTION TO PREVIOUSLY ISSUED EUPS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
DOCUMENTATION OF HVAC UNITS INCLUDING RELOCATION, REPLACEMENT, REMOVALS AND CORRECTION TO PREVIOUSLY ISSUED EUPS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.