212 1 STREET, Brooklyn, NY, 11215 · New York City · 25 total events
REPLACE WATER COOLED AIR CONDITIONER UNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Temporary structures for event programing at Spring Studios. Removed at the end of the programing. No changes to existing structures, use or egress.
Temporary structures for events at Spring Studios. Removed at the end of the programing. No changes to existing structures, use or egress.
Installation of temporary partitions, no alt to exist structures for Annual Independent Art Fair. A TPA permit is required. Producer is responsible to monitor site safety. All production equipment removed upon event completion.
Temporary structures for a Hangar 4 event at Spring Studios. Removed at the end of the programing. No changes to existing structures, use or egress.
Mechanical work related to LL87 upgrades
General Construction work & protection related to Mechanical Systems Upgrades.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modification of existing sprinkler system for office layout renovation at part of 7th floor.
Temporary structures for a DS event in the studios. Removed at the end of the programing. No changes to existing structures, use or egress.
Temporary structures for NYFW at Spring Structures removed at the end of the programing. No changes to existing structures, use or egress.
Temporary structures for a GMC event. Removed at the end of the programing. No changes to existing structures, use or egress.
Temporary structures for the SLB event. Removed at the end of the programing. No changes to existing structures, use or egress. SAPO# 676913
Temporary structures for events at Spring Studios. Structures removed at the end of the programing. No changes to existing structures, use or egress.
Temporary structures for Richard Attias event Removed at the end of the programing. No changes to existing structures, use or egress.
INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Temporary scenic props for MCW event at Spring Studios Removed at the end of the programing. No changes to existing structures, use or egress.
Install an Outdoor Emergency Generator with Fuel Oil Storage at Roof Level.
Temporary structures and occupancy for HBO Event Removed at the end of the programing. No changes to existing structures, use or egress. SAPO Event ID Permit #580209
Temporary structures for Tribeca Film Fest programing. Structures removed at the end of the programing. No changes to existing structures, use or egress.
Infill existing opening and install double fire rated doors at 1st floor space.
Mechanical work related to chiller replacement and BMS intergration.
Modification of existing Sprinkler System.
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019