209 KINGSBOROUGH 2 WALK, Brooklyn, NY, 11233 · New York City · 17 total events
FMH EMERGENCY FACADE REPAIRS.- ENTIRE WEST FACADE AND PARTIAL SOUTH FACADE NO CHANGE OF USE, EGRESS OCCUPANCY.
REMOVE AND REPLACE EXIST'G FIREPROOFING ON STEEL BEAMS AND METAL DECKING.
Mechanical scope associated with a new boiler room installation in the Cellar of the Faculty Memorial Hall (FMH). No change of use, egress or occupancy.
Installation of the required by the ConEd Gas meter Decorative Enclosure, no enlargement of the ZFA. No change of use, egress, or occupancy.
Installation of 2 new hydronic boilers in the Cellar of the Faculty Memorial Hall (FMH). No change of use, egress or occupancy.
Plumbing scope associated with a new boiler room installation in the Cellar of the Faculty Memorial Hall (FMH). No change of use, egress or occupancy.
Application is filed for the boiler room construction on the Cellar Level of the Faculty Memorial Hall. No change of use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Application is filed for the interior renovation of Room 131 at the FMH. No change of use, egress or occupancy.
Application is filed for the Existing pantry and restroom renovation on the 005FL at the Faculty Memorial Hall (FMH). No change of use, egress or occupancy.
Plumbing work associated with the pantry and restroom renovation 005FL, FMH building. No change of use, egress or occupancy.
INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Replacement of the railings on the 2nd floor roof at Faculty Memorial Hall (FMH). No change of use, egress or occupancy.
Steel and concrete for support of HVAC equipment
Mechanical work associated with 2nd floor offices renovation at FMH (Faculty Memorial Hall) building including installation of new split system. No change of use, egress or occupancy.
Plumbing work associated with 2nd floor offices renovation within Faculty Memorial Hall including removal of 3WC, 2LAV; replacement of 1 DF; installation of 2 new SINKS , 1 new DF and a associated piping. No change of use, egress or occupancy.