2061 EAST 1 STREET, Brooklyn, NY, 11223 · New York City · 11 total events
Modification to existing Verizon site. Replace 6 antennas, 8 RRH units, and 3 OVPs. Relocate 4 GPS units, and install a new platform with 3 cabinets. Ladders & railings as per FDNY approval.
Herewith filling Roof Replacement
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Removal of walls, ductwork, light fixtures damaged from fire, To be replaced with new installation of fire rated partition, ductwork & light fixtures.
Removal of ductwork damaged from fire, to be replaced with new, installation of New Ductwork
INSTALLATION OF TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Proposed general construction and mechanical work .No change of occupancy, use, or egress.
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
WORK WITHOUT A PERMIT. NOTED: 2ND FL REMOVAL OF FULL HEIGHT PARTITION WALLS TO COMBINE 2 FRONT "B" UNITS, REMOVAL OF COOKING SPACE. 1ST FL REMOVAL OF FRONT/REAR RMS COOKING SPACE, BSMT RELOCATED COOKING SPACE TO REAR AND OPENING CREATED AT REAR FLOOR TO INSTALLED METAL SPIRAL STAIRCASE FROM BASEMENT TO 1ST FL.
FACADE RESTORATION INCLUDING FAEBRICK/PARAPET REPLACEMENT, WINDOWS SILL AND LINTEL REPLACEMENT AND STONE PATCHING AS PERPLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Replacement of HVAC Units and associated ducts and piping on Second Floor. New Dry cooler on 1st Floor Roof