20 4 AVENUE, Brooklyn, NY, 11217 · New York City · 10 total events
OT: Interior Renovation - Removal of Doors, Walls, & Flooring and installation of new. MH: Modification of Existing Ductwork and Replacement of Thermostats. No change in Use, Occupancy, or Egress.
INSTALLATION OF PIPE SCAFFOLDING ON GROUND FLOOR ATTACHED TO THE FACADE OF THE BUILDING AND ON LOWER ROOFS IN ORDER OF PERFORMING CONSTRUCTION WORK.
OT: Exterior Renovation of Roofing / Facade. Interior Renovation to Repair Damaged Surfaces. ST: Provide new Steel Dunnage at Roof for Mechanical Units. No change in Use, Egress, or Occupancy.
INSTALLATION OF CONSTRUCTION FENCE (CLF) TO PROTECT PUBLIC FROM ENTERING CONSTRUCTION SITE
MH: Replacement of Existing Mechanical Units. Temp. Removal / Relocation of Mechanical Units. No change in Use, Occupancy, or Egress.
OT: Interior Renovation - Removal of Doors, Walls, & Flooring and installation of new. MH: Modification of Existing Ductwork and Replacement of Thermostats. No change in Use, Occupancy, or Egress.
OT: Exterior Renovation of Roofing / Facade. Interior Renovation to Repair Damaged Surfaces. ST: Provide new Steel Dunnage at Roof for Mechanical Units. No change in Use, Egress, or Occupancy.
PL: Remove Gas Piping and Install New for Mechanical Units. Replace Plumbing Fixtures in kind. No change in Use, Occupancy, or Egress.
INSTALLATION OF SIDEWALK SHED TO AROUND SCHOOL BUILDING TO PROTECT THE PUBLIC WHILE CONSTRUCTION IS PERFORMED. ADDITIONAL SIDEWALK SHED (88 FT LONG) WAS ADDED AT THE WEST OF SCHOOL BUILDING.
PL: Remove Existing Plumbing Fixture and Associated Piping. No change in use, occupancy, or egress.