2 52 STREET, Brooklyn, NY, 11232 · New York City · 8 total events
STRUCTURAL REPAIR WORK @ 2ND FLOOR SLAB (DONE FROM 1ST FLOOR)
Replacement of AT&T (2) HVAC & Condensing units. No change to use, egress, or occupancy. PAA to revise make model condenser units, no change to quantities.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
Installation of non-emergency gas fired generator with related gas booster pump on roof. Installation of ATS in existing equipment room in basement. No change to occupancy, use, or egress.
Installation of new steel dunnage platform on roof. No change to occupancy, use or egress.
AT&T - Replacement of existing antennas and RRH units on monopole. Installation of RRH units on monopole. Retrofit of existing cabinet in equipment room. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.