2 3 PLACE, Brooklyn, NY, 11231 · New York City · 9 total events
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE
INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Filing for temporary construction fence surrounding the Brownville Recreation Center as per plans herewith submitted.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1555 LINDEN BOULEVARD, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
PROPOSED REPLACEMENT AND RECONSTRUCTION OF R-22 HVAC UNITS WITH NEW R-410 HVAC UNITS. EXISTING DUCTWORK WILL NOT BE DISTURBED. PLANS CONFORM TO BC 28-104.7. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Removal of existing (1) 6000-gallon underground storage tank with associated piping as indicated in plans. Existing boiler equipment to remain. No change in use, egress or occupancy.
General Construction and Earthwork worktypes associated with the removal of the fuel oil underground storage tank. No change in use, egress or occupancy.
Use of Mechanical Construction Equipment to lift, hoist and move material, earth and personnel on site. No change in use, egress or occupancy.