2 1/2 BARTLETT PLACE, Brooklyn, NY, 11229 · New York City · 8 total events
Filing to patch, repair, replace facade surfaces as per plans. No change in use, egress, or occupancy under this application.
Filing to patch, repair, replace slab and building framing as indicated on plans. Work to include demo of abandoned water tower/bulkhead. No change in use, egress, or occupancy under this application.
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE, NO CHANGESS IN USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF DEBRIS CHUTE AS PER PLANS. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE, NO CHANGESS IN USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF SIDEWALK SHED . SIDEWALK SHED LIVE LOAD 300 PSF. ALL EQUIPMENT COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF SIDEWALK SHED . SIDEWALK SHED LIVE LOAD 300 PSF. ALL EQUIPMENT COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
STANDPIPE WORK TO INCLUDE DEMO OF EXISTING STANDPIPE AND REPLACE WITH MANUAL DRY STANDPIPE SYSTEM, AND ABANDONMENT OF ROOF TANK IN PLACE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.