2 1/2 BARTLETT PLACE, Brooklyn, NY, 11229 · New York City · 10 total events
Installation of (1) single drinking fountain and (1) dual drinking fountain.
Filing on contractor's behalf for 8'h plywood construction fences in Phase 1: 165 LF of fences and 35 LF (attached to existing fences). Phase 2: 70LF of 8'h plywood construction fences and 35 LF of 8'h plywood construction fences attached to existing fenc
Provide new drinking fountain, wash fountain, triple sink & associated sanitary, Domestic cold/hot water piping, vent piping & accessories.
Room conversion project that includes the conversion of an existing Boys Locker Room and accessory rooms to new classrooms. Exterior work is the installation of an equipment pad with fencing. There will be no change in use, egress or occupancy.
The conversion of existing classrooms into specialized education D75 classrooms at Rooms 103, 107 and 116.
Provide new Split heat pump HVAC system with associated ductwork, controls and accessories.
Filing for temporary construction fence. No change in use, egress or occupancy.
Installation of (1) single drinking fountain and (1) dual drinking fountain.
Replace existing Sink and associated sanitary & water line up to the point of connection in Rooms 103, 107 and 116.
Replace existing grilles, volume damper and associated ductwork up to the point of connection in Rooms 103, 107 and 116.