13 GREENPOINT AVENUE, Brooklyn, NY, 11222 · New York City · 19 total events
APARTMENT ONLY
0 infested unit(s) reported
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Application is being filed for the installation of a new mechanical system for an Eating & Drinking Establishment.
This Alteration is being filed for the interior renovation of commercial space on the Basement level.
INSTALLING NEW COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM. INSTALLING NEW S/S EXHAUST HOOD WITH NEW EXHAUST/MUA DUCTS AND NEW EXHAUST/MUA FANS. NO OTHER WORK UNDER THIS FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
General construction associated with commercial tenant fitout. No change on occupancy, use or egress.n
The Alteration application is being field for modifications & additions to the existing sprinkle system & related piping as per plans filed herewith. There are no change in use, egress or occupancy.
Alteration is being filed for the installation of new plumbing system for restaurant on the 1st floor. In conjunction with application #'s B08043155, B08044664.
Mechanical work associated with tenant fitout work. No change in occupancy, use or egress.
Plumbing work associated with commercial tenant fitout. No change in occupancy, use or egress.
Construction Fence
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF SUPPORT SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Installation of 11'-0 curb cut on Kent Street, 113'-7 3/4 from West Street. No change in occupancy, use or egress.
Installation of ten foot curb cut on Greenpoint Avenue, 185'-3 1/2 from West Street. No change in occupancy, use or egress.
installation of construction fence for entire lot 45
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.