1278 69 STREET, Brooklyn, NY, 11219 · New York City · 60 total events
AT&T - Installation of new antenna sectors with related RRH units and GPS. Installation of new steel dunnage platform with related equipment cabinets. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Installation of non-emergency gas fired generator with related gas booster pump on roof. Platform filed under separate application. No change to occupancy, use, or egress.
MINOR DEMOLITION & CONSTRUCTION, CHANGES TO USE & OCCUPANCY. NO CHANGE TO ZONING OR EGRESS.
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. PLYWOOD FENCE 4-5 WIDE AT 5 AVENUE AND EAST 44TH STREET ELEVATIONS. SHALL BE PERMITTED AT D.O.T NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. DOT PERMIT FILED SEPARATELY BY OTHERS.
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
FILING FOR STRUCTURAL FRAMING AS PER PLANS FILED . NO CHANGE TO USE, EGRESS OR OCCUPANCY.
SCOPE OF WORK IS LIMITED TO THE REMOVAL & ISNTALLATION OF DUCTOWRK, DIFFUSERS, FANS, PERIMETER FAN COIL UNITS, AC UNITS, AND RELATED MECHANICAL PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FILED HEREWITH NEW PARTIAL INTERIOR & EXTERIOR WORK, AS PER PLANS FILED ON THE 1ST & 2ND FLOOR LEVEL & FACADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FILING FOR INTERIOR RENOVATION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FILING TO INSTALL NEW PLUMBING FIXTURES AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
REMOVAL & INSTALLATION OF PLUMBING FIXTURES & RELATED PIPING AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Provide sinks, elec HWH and drain pump to 16th floor office space. No change in egress, use or occupancy.
Provide non load bearing partitions, doors, ceilings and relocate diffusers in 16th floor office space. No change in egress, use or occupancy.
Provide non load bearing partitions, doors, ceilings and relocate diffusers in 16th floor office space. No change in egress, use or occupancy.
Filing for plumbing and sprinkler work for office renovation. No change in use, egress or occupancy.
FILING TO INSTALL NEW SPRINKLER HEADS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filing for plumbing and sprinkler work for office renovation. No change in use, egress or occupancy.
FIling for mechanical renovations for office space. No change in use, egress or occupancy.
Filing for interior demo and general construction for commercial office space. No change in use, egress or occupancy.
MINOR INTERIOR RENOVATION, NEW NON BEARING PARTITIONS, FINISHES AND LIGHTING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FILING TO INSTALL NEW MECHANICAL SYSTEM AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FILING FOR STRUCTURAL FRAMING AS PER PLANS FILED . NO CHANGE TO USE, EGRESS OR OCCUPANCY.
SPRINKLER WORK FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
DUCT WORK AND ASSOCIATED PIPING FILED IN CONJUNCTION WITH DOB NOW GC AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
MINOR PARTITION WORK, NEW RAMP TO VAULT (FILED UNDER SEPARATE APPLICATION - M00832529), MINOR CEILING WORK AND LIGHTING
Structural work for the 10th floor vault as indicated on drawings
Jewelex - Minor construction work on part of the 18th floor as indicated on drawings. no change to use egress or occupancy
Jewelex - Minor sprinkler work on part of the 18th floor as indicated on drawings.
Related plumbing work associated with cooling tower replacement on the roof as indicated on drawings
Mechanical work to replace cooling tower and related work on the roof and sub-cellar as indicated on drawings
Structural work associated with cooling tower replacement on the roof as indicated on drawings
Removal of plumbing fixtures and capping of piping on the 2nd, 3rd, 5th and 11th floor as indicated on drawings
Mechanical work associated with the removal of duct work on the 2nd, 3rd, 4th, 5th and 11th floor as indicated on drawings
Construction work to existing retail space on the 1st floor as indicated on drawings
Sprinkler work to existing retail space on the 1st floor as indicated on drawings
Mechanical work to existing retail space on the 1st floor as indicated on drawings
Mechanical work on the 5th floor (ARS Investment) as indicated on drawings
Plumbing work on the 5th floor (ARS Investment) as indicated on drawings
Construction work on the 5th floor (ARS Investment) as indicated on drawings. EN drawings are submitted under M00725538
Sprinkler work on the 5th floor (ARS Investment) as indicated on drawings
Mechanical work on the 9th floor (core restrooms/lobby) as indicated on drawings
Construction work on the 9th floor (core restrooms, lobby) as indicated on drawings
Interior demolition of non load bearing partitions on the 2nd, 3rd, 4th, 5th and 11th floor as indicated on drawings
Plumbing work on the 9th floor (core restrooms/lobby) as indicated on drawings
Removal of sprinkler heads and installation of temporary sprinkler loop on the 2nd, 3rd, 4th, 5th and 11th floor as indicated on drawings
Sprinkler work on the 9th floor (core restrooms/lobby) as indicated on drawings
Plumbing work on the 9th floor (Amenities space) as indicated on drawings
Plumbing work on the 14th floor (RadianX) as indicated on drawings
Sprinkler work on the 14th floor (RadianX) as indicated on drawings
Construction work on the 14th floor (RadianX) as indicated on drawings. Energy drawings are submitted under M00 625279-I1