1275 59 STREET, Brooklyn, NY, 11219 · New York City · 43 total events
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR (2C/3M) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
EXTERIOR RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Herewith filing for modifications to the existing sprinkler system on the 4th, 5th, and 6th floors as indicated on plans. No change in use, occupancy, or egress.
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 22ND FLOOR (20C/22M) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Herewith filing for modifications to the existing Plumbing systems of the 3rd, 4th, 5th, and 6th floors as indicated on plans. No change in use, occupancy, or egress.
Herewith filing for structural modifications of the 4th, and 5th floors as indicated on plans. No change in use, occupancy, or egress.
Herewith filing for modifications to existing mechanical systems of the 4th, 5th, and 6th floors as indicated on plans. No change in use, occupancy, or egress.
Herewith filing for removal and installation of walls, doors, floor finishes, and ceilings of 4th, 5th, and 6th floors as indicated on plans. No change in use, occupancy, or egress.
NEW GAS LINE FOR EXTERIOR FIRE PITS.
Modification to the existing MH system on the 11th FL Office. No change of use, egress, or occupancy.
Interior renovation REMOVE AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS, DOORS & FLOORS AS SHOWN ON DRAWINGS FILED HEREWITH. Of the 11th FL office space for Swinerton. No change in use, egress, or occupancy.
Modification to the plumbing system on the 11th FL. No change in use, egress, or occupancy.
Modification of the sprinkler heads and piping on the 11th FL. No change in use, egress, or occupancy.
INSTALL 1 NEW SPRINKLER HEAD & PIPING AND REPLACE 6 SPRINKLER HEADS AND PIPING.
INSTALLATION OF NEW SPRINKLER SYSTEM TO COMPLY WITH LOCAL LAW 26 OF 2004
MECHANICAL MODIFICATIONS ASSOCIATED WITH INTERIOR OFFICE RENOVATION
PROPOSE TO MODIFY DUCTWORK AND UNITS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
SPRINKLER MODIFICATIONS ASSOCIATED WITH INTERIOR OFFICE RENOVATION
REPLACE 10 SPRINKLER HEADS. INSTALL 1 NEW SPRINKLER HEAD AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH.
FILING HEREWITH FOR OUTDOOR TERRACE AS SHOWN ON DRAWINGS.
RELOCATE 1 LAV & 1 WC ON EXISTING ROUGHING. INSTALL 1 LAV, 1 WC & 1 HWH (NON GAS) ON DRAWINGS FILED HEREWITH.
RELOCATE 1 HWH (NON GAS) AND PIPING. INSTALL 2 NEW DISHWASHERS, 1 SINK, 1 FLOOR DRAIN, 1 WATER PIPING & 1 SANITARY PIPING AS SHOWN ON DRAWINGS FILED HEREWITH.
MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH.
REMOVE AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS, DOORS & FLOORS AS SHOWN ON DRAWINGS FILED HEREWITH.
REMOVE AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS, DOORS & FLOORS AS SHOWN ON DRAWINGS FILED HEREWITH.
MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH.
INTERIOR RENOVATION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH.
REPLACE 30 SPRINKLER HEADS AND REMOVE 3 SPRINKLER HEADS AS SHOWN ON DRAWINGS FILED HEREWITH.
RELOCATE 2 LAVS & 2 WATER CLOSETS. INSTALL NEW 1 HOT WATER HEATER (NON GAS), 1 LAV, 1 WATER CLOSET, 2 FLOOR DRAINS, 1 WATER PIPING & 1 SANITARY PIPING AS SHOWN ON DRAWINGS FILED HEREWITH.
MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH.
REMOVE EXISTING STEEL GRAVITY AND SUCTION TANKS ON CELLAR, 15 & ATTIC LEVELS.. INSTALL TRIPLEX BOOSTER PUMP ON SUB CELLAR LEVEL AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS, DOORS AND FLOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL PLUMBING FIXTURES AND PIPING. INSTALL NEW SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL PLUMBING FIXTURES AND PIPING. INSTALL NEW SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING MODIFICATIONS ASSOCIATED WITH INTERIOR OFFICE RENOVATION
Modifications to existing Sprinkler system on the 8th FL.
Installation of new plumbing fixtures on the 8th FL, No change of use, egress or occupancy. Install new 2- DW, 3-SK (Non-res), 1- Hot water heater (non-gas) 2 - Floor D
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.