126 LIBERTY AVENUE, Brooklyn, NY, 11212 · New York City · 175 total events
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES, AT BULKHEAD DOOR TO ROOF AT PUBLIC HALL, 4th STORY
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT C1, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT D1, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT B1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT A2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE DOOR , 1st STORY
Apt C2 — Possession
Apt A1 — Possession
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKING ASSEMBLY AT BUILDING FRONT ENTRANCE AT PUBLIC HALL, 1st STORY
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT B3, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
OUTLET/SWITCH
ELECTRIC/GAS RANGE
ENTIRE BUILDING
DOOR
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET, AT BUILDING FRONT ENTRANCE DOOR , 1st STORY
§ 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINNIMUM OF 100 WATTS REQUIRED
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MAIL BOXES FOR APARTMENT A1, A2, A3 AND C2 , 1st STORY
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET, AT BUILDING FRONT ENTRANCE DOOR. , 1st STORY
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING , 1st STORY
LIGHTING
MAILBOX
DOOR
CARBON MONOXIDE DETECTOR
COOKING GAS
NO LIGHTING
WATER SUPPLY
DOOR
WINDOW FRAME
Judgment: NO
DOOR
BELL/BUZZER/INTERCOM
SMOKE DETECTOR
CARBON MONOXIDE DETECTOR
DOOR
ELECTRIC/GAS RANGE
OUTLET/SWITCH
POWER OUTAGE
REFRIGERATOR
NO LIGHTING
ENTIRE BUILDING
ENTIRE BUILDING
§ 27-2005 ADM CODE PROVIDE GLASS PANELS AT FRONT ENTRANCE DOOR TO BUILDING , 1st STORY
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXI GLASS AT BUILDING ENTRANCE DOOR AT BUILDING ENTRANCE DOOR , 1st STORY
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED, DECORATIVE, MASONRY GATE WITH MISSING MOR AT ENTRANCE TO BUILDING AT PUBLIC HALL, 1st STORY
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AT THE BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AT THE BUILDING ENTRANCE DOOR , 1st STORY
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXI-GLASS PANELS INSTALED AT FRONT ENTRANCE DOOR TO BUILDING , 1st STORY