125 16 STREET, Brooklyn, NY, 11215 · New York City · 299 total events
Removal and modification of mechanical system in a retail space.
Sprinkler modification in conjunction with renovation of an existing retail space.
Sprinkler work as shown on plans filed herewith.
Relocation of house cabinets.
Sprinkler work as shown on plans filed herewith.
Removal of plumbing fixtures from a retail space.
modifications to an existing sprinkler system
Relocation of house cabinets.
Structural work as shown on plans filed herewith. No change to use, egress or occupancy.
Relocation of Fire Department valve cabinet.
Plumbing work as shown on plans filed herewith. No change to egress, use or occupancy.
Sprinkler work as shown on plans filed herewith. No change to egress, use or occupancy.
Renovations to existing retail space. General construction, inclusive of demolition, carpentry/drywall.
Mechanical work as shown on plans filed herewith. No change to use, egress or occupancy.
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
General Construction as shown on plans filed herewith. No change to use, egress or occupancy.
General Construction as shown on plans filed herewith. No change to use, egress or occupancy.
Mechanical work as shown on plans filed herewith. No change to use, egress or occupancy.
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
10th fl roof work as shown on plans filed herewith.
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
HEAVY DUTY SIDEWALK SHED DURING GENERAL CONSTRUCTION WORK FILED SEPARATELY UNDER APPLICATION # M01066237. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
ALT-CO APPLICATION TO CHANGE THE EXISTING OCCUPANCY USE OF THE 10TH FLOOR, E-BUSINESS,TO BOTH E-BUSINESS AND F-4 EATING AND DRINKING. Associated general construction work as shown on plans filed herewith.
INTERIOR SPRINKLER MODIFICATIONS ON 29TH FLOOR RELATED TO INTERIOR OFFICE RENOVATION. NO CHANGE OF USE, EGRESS OR OCCUPANCY. NO EXTERIOR WORK
INTERIOR MECHANICAL MODIFICATIONS ON 29TH FLOOR RELATED TO INTERIOR OFFICE RENOVATION AS PER PLANS FILED HEREWITH. NO EXTERIOR WORK
General Construction as shown on plans filed herewith Suite 118 (Nike). No change to use, egress or occupancy.
INTERIOR PLUMBING MODIFICATIONS ON 29TH FLOOR RELATED TO INTERIOR OFFICE RENOVATION AS PER PLANS FILED HEREWITH. NO EXTERIOR WORK
INTERIOR RENOVATION OF EXISTING OFFICE SPACE AT THE 29TH FLOOR. NO CHANGE OF USE.EGRESS OR OCCUPANCY. NO EXTERIOR WORK
General construction in conjunction with interior renovation of Space 127 as shown on plans. No change in use, egress or occupancy
STRUCTURAL ALTERATION WORKS ON THE FIRST FLOOR INCLUDING ADDING NEW SECONDARY STEEL FRAMING FOR FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical work as shown on plans for Space 127. No change in use, egress or occupancy.
INSTALLATION OF NEW PLUMBING FIXTURES WITH ASSOCIATED COLD WATER, HOT WATER, HOT WATER RETURN, VENT AND SANITARY PIPING. NEW INSTALLATION OF UNDER-CABINET EJECTOR PUMPS, HOT WATER HEATER & HOT WATER CIRCULATION PUMP. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR DEMO OF PLUBMING FIXTURES ON 29TH FLOOR AS INDICATED ON PLANS FILED HEREWITH.
INTERIOR DEMOLITION OF MECHANICAL DUCTWORK AND RELATED FINISHES AS PER PLANS FILED HEREWITH.
DEMOLITION OF EXISTING FIRE HOSE VALVE CABINET WITH INSTALLATION OF NEW FIRE HOSE VALVE CABINET AND NEW SUPERVISED ISOLATION VALVE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
NSTALLATION OF FIRST FLOOR SPRINKLER MAIN AND SPRINKLER HEADS TO SUPPORT TENANT PROGRAMMING LAYOUT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Interior demo of plumbing fixtures and associated piping. No change in use, egress or occupancy.
Demo of existing sprinkler heads and associated branch piping in tenant space 127. Installation of temp SP loop.
Installation of temporary ice rink service tent on exterior plaza for 2021 Ice Rink at Brookfield Place. No alterations to existing structures.
INTERIOR DEMOLITION OF NON-STRUCTURAL PARTITIONS AND RELTED FINISHES OF EXISTING OFFICE SPACE AT THE 29TH FLOOR. NO CHANGE OF USE.EGRESS OR OCCUPANCY. NO EXTERIOR WORK
Interior demolition of partitions, ceilings and doors for tenant space 127. No change in use, egress or occupancy.
Interior demo of 1st floor existing mechanical equipment associated controls, ductwork and piping. No change in use, egress or occupancy.
WORK UNDER THIS APPLICATION IS LIMITED TO THE RENOVATION OF THE 1STFLOOR (SPACE 127), INVOLVING INTERIOR NON-LOADING BEARING PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
General construction work as shown on plans.
Mechanical work as shown on plans
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
Mechanical work as shown on plans filed herewith. No change to use, egress or occupancy.
General construction as shown on plans filed herewith. No change to use, egress or occupancy.
Plumbing work as shown on plans filed herewith. No change to use, egress or occupancy.
Mechanical work in cellar as shown on plans (in conjunction with Daily Provisions - Food Court Space 253).