INSTALLATION OF OVERHEAD PROTECTIONS DURING CONSTRUCTION. OVERHEAD PROTECTION SHALL COMPLY WITH NYCC 2022 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Existing dwelling units to be combined into one dwelling unit on floors 3-13, 15-17. No change in use/egress. No change to MEP.
Suspended Hanging Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
INSTALL 3 GAS BOILERS ON THE 19TH FLOOR IN THE MECHANICAL EQUIPMENT ROOM. FILED IN CONJUNCTION WITH NB 121205150.
INSTALL 3 GAS BOILERS ON THE 19TH FLOOR IN THE MECHANICAL EQUIPMENT ROOM. FILED IN CONJUNCTION WITH NB 121205150.
installation of new cellar and roof generator mounted fuel oil tanks aS PER PLANS FILED HEREWITH . FILED IN CONJUNCTIONWITH NEW BUILDING APPLICATION.
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
This application is filed for a temporary use permit for a sales office pursuant to section AC 28-111 and buildings bulletin 2010-002.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modification to existing Standpipe system as per plans filed herewith. Temporary standpipe as per Local Law No 64
TEMPORARY MEANS AND METHODS CONSTRUCTION EQUIPMENT FOR CONCRETE FORM WORK INSTALLATION, WORKER PLATFORM SYSTEM. OUTSIDE WALL PLATFORM SYSTEM AT SELECT LOCATIONS OF 9TH THRU ROOF LEVELS. IN CONJUNCTION WITH NB-121205150.
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB-121205150.
INSTALLATION OF FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.