122 2 STREET, Brooklyn, NY, 11231 · New York City · 28 total events
FILING FOR UNDERGROUND PLUMBING IN CONJUNCTION WITH NEW BUILDING# X08006985
MECHANICAL SCOPE IN CONJUNCTION WITH NEW BUILDING# X08006985
FOUNDATION SCOPE IN CONJUNCTI0N WITH NEW BUILDING X08006985-I1
SUPERSTRUCTURE STRUCTURAL WORK IN CONJUCTION WITH NEW BUILDING X08006985-I1
FILING FOR NEW MIXED USE AFFORDABLE HOUSING RESIDENTIAL BUILDING
INSTALLATION OF TEMPORARY WINDOW PROTECTION OVER ADJACENT PROPERTY WINDOWS AS PER PLANS. TEMPORARY PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
SUPPORT OF EXCAVATION (SOE) SCOPE IN CONJUCTION WITH NEW BUILDING# X08006985-I1
INSTALLATION OF SPRINKLER/STANDPIPE IN CONJUNCTION WITH NEW BUILDING #X08006985-I1
INSTALLATION OF SPRINKLER/STANDPIPE IN CONJUNCTION WITH NEW BUILDING #X08006985-I1
FILING FOR TEMPORARY STANDPIPE IN CONJUNCTION WITH NEW BUILDING# X08006985
INSTALLATION OF MULTI-POINT SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
PLUMBING SCOPE IN CONJUNCTION WITH NEW BUILDING# X08006985
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE, NO CHANGESS IN USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. THIS FENCE IS FILED IN CONJUNCTION WITH NB-X08006985-I1.
INSTALLATION OF FOUNDATION BRACING AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-X08006985.
mechanical means to assist with removal of slab, and loading out of debris.
use of mechanical equipment to assist with structural removal, loading out debris, and removal of foundations.
FULL DEMOLITION OF TWO STORY BUILDING, AS PER PLANS FILED HEREWITH.
FULL DEMOLITION OF 2-STORY BUILDING AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH FULL DEMO AT 410 BEDFORD PARK BLVD DOB#X00897696.
installation of construction fence to protect site during full demolition.
Installation of construction fence to protect site, during full demolition.
INSTALL MEDIUM DUTY SCAFFOLDING FOR DEMOLITION WORK AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. SIDEWALK SHED IS FILED UNDER SEPARATE FILING.
INSTALL MEDIUM DUTY SCAFFOLDING FOR DEMOLITION WORK AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. SIDEWALK SHED IS FILED UNDER SEPARATE FILING.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.