121 1 PLACE, Brooklyn, NY, 11231 · New York City · 11 total events
Install new sprinkler system for new tenant fit out as per plans for the south side of the building on the 21st floor only under this application.
Install new sprinkler system for new tenant fit out as per plans for the south side of the building on the 21st floor only under this application.
INSTALLATION OF 1 PANTRY SINK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
REMOVE AND INSTALL INTERIOR PARITIONS, DOORS AND CEILINGS AT 12 FLOOR DATA CENTER. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Provide new Energy Recovery Ventilator to provide the code required ventilation. Furnish and install new 30-ton self-contained AC unit, associated piping and distribution ductwork. Furnish and install new variable air volume air terminals and all controls
Remove and install new chilled water lines from central mechanical room (chiller room) to new Data Center. Provide new backup 30-ton computer room air conditioning unit (CRAC) and five 5-ton in-row CRAC units. Minor modifications to existing ductwork.
Remove and install interior partitions, floors and ceilings. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Demolition of existing ductwork. Installation of new ductwork based on new architectural layout. New bathroom exhaust fan.
Add partition walls in existing open office . No change to use, egress and occupancy
Installation of new toilet, shower, lavatory, and pantry sink.
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019