115 WILLOW STREET, Brooklyn, NY, 11201 · New York City · 9 total events
0 infested unit(s) reported
General Construction at apt #5A at the 5th floor indicated on drawings filed herewith no change in use egress or Occupancy under this application
REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER LAA APPLICATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. NO PARTIAL DEMOLITION OR STRUCTURAL WORK OF ANY KIND.
Herewith file plumbing plans for Apt. 4B. GC filed under B00779545
Renovation of Apt. 4B including partition work.No change to use, egress or occupancy. Plumbing filed under separate application.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
FACADE REPAIRWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
MODIFICATION TO PLUMBING AND GAS FIXTURES FOR MASTER BATHROOM, KITCHEN AND LAUNDRY ROOM.
TEMPORARY INSTALLATION OF SUPPORTED PIPE SCAFFOLD WITH MATERIAL HOIST. AS SHOWN ON PLANS. SHALL COMPLY WITH BSA-362-44-SM, LL-33/91, CHAP 33, SECTION 33 OF 2014 NYC DOB BC & TPPN # 9/99. NO CHANGE IN EGRESS, OCCUPANCY OR USE ASSOC W/ THIS PERMIT.