1022 43 STREET, Brooklyn, NY, 11219 · New York City · 208 total events
Installation of new plumbing fixtures and associated piping on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
Installation of a new sprinkler system on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
Installation of new partitions, doors, ceilings and finishes on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
Installation of a new HVAC system on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
Sprinkler work to include demolition and installation of temporary loop and plumbing work to include demolition of existing fixtures.
Infill of stair opening on 14th and 15th Floors, and removal of interior convenience stair between 13th and 15th Floors
Removal of interior non-load bearing partitions, doors and millwork. No change to use, egress or occupancy
Sprinkler work to include demolition and installation of temporary loop and plumbing work to include demolition of existing fixtures.
Demolition of existing mechanical equipment associated controls, ductwork and piping
Installation, removal, and relocation of sprinkler heads to accommodate new architectural layout.
Call
Modifications to the existing HVAC system (La Pecora Bianca) as per plans. No change to use, egress or occupancy.
Framing for new raised floor system and new mechanical platform (La Percoa Bianca) as per plans. No change to use, egress or occupancy.
Installation of new partitions, doors, ceilings and finishes (La Pecora Bianca) as per plans. No change to use, egress or occupancy.
FILING TO REMOVE INTERNAL STAIR AND PATCHING OPENING(FLOOR SLAB INFILL AT PART OF FLOOR 14) AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FILING TO REMOVE MECHANICAL EQUIPMENT & PIPING AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Install temporary shoring to support deteriorated sections of the reinforced concrete slab.
Removal of existing plumbing fixtures and associated piping on the 22nd floor as per plans. No change to use, egress or occupancy.
Removal and disposal of interior partitions, doors, stair, suspended ceilings and finishes with patching and painting on the 22nd floor as per plans. No change to use, egress or occupancy.
HVAC removals on the 22nd floor as per plans. No change to use, egress or occupancy.
Modification to existing plumbing, sprinkler, standpipe fixtures as per plans filed. No change in use, egress or occupancy.
Modification to existing plumbing, sprinkler, standpipe fixtures as per plans filed. No change in use, egress or occupancy.
Modification to existing plumbing, sprinkler, standpipe fixtures as per plans filed. No change in use, egress or occupancy.
Removal and renovation of non-load bearing partitions. No change in use, egress or occupancy
New conference room, offices, and workstations
Modification and removal of existing HVAC and ductwork systems. No change in use, egress or occupancy.
Existing sprinkler heads in lobby area to be replaced and relocated. New sprinkler heads added in lobby expansion. Plumbing work to include outdoor canopy upgrade & storm drainage.
Existing sprinkler heads in lobby area to be replaced and relocated. New sprinkler heads added in lobby expansion. Plumbing work to include outdoor canopy upgrade & storm drainage.
Modifications to the existing 1st floor storefront as per plans. No change to use, egress or occupancy.
Modification to the existing HVAC design to adaptively reuse the existing equipment and distribution for the new layout.
Modification to existing sprinkler systems as per plans filed herewith. No change in use egress or occupancy.
Removal and renovation of non-load bearing partition and interiors. No change in use, egress or occupanct.
Modification to HVAC systems. No change in use, egress or occupancy.
Modify existing ductwork for new lobby footprint, provide heating within vestibules and lobby, refurbishment of existing air handler, and installation of new air handler and unit heater to serve lobby space.
Installation, removal, and relocation of sprinkler heads to accommodate new architectural layout.
New conference room, offices, and workstations
Modification to the existing HVAC design to adaptively reuse the existing equipment and distribution for the new layout.
Scope to include new storefront and marquee at Broadway main lobby entrance, new storefront at 50th Street secondary lobby entrance, associated structural modification, new mechanical room at 2nd floor, and interior work.
Installation of a temporary loop under scaffolding as per the filed plans. No change to use, occupancy or egress.
Design of the steel canopy framing system, including connection details for attaching the canopy and curtain wall supports to the existing building's structural steel.
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Modifications to the existing plumbing system (La Pecora Bianca) as per plans. No change to use, egress or occupancy.
Modification of sprinkler heads as shown on plans. 44th floor: (1) head relocated 45th floor: (1) head relocated (2) heads removed 46th floor: (5) heads replaced No change to use, egress or occupancy.
Modification of ductwork in 45th floor pantries, relocated return grilles and thermostats on floors 44, 45, and 46, and rebalanced diffusers on floors 45 and 46. No change to use, egress or occupancy.
Addition and removal of interior nonbearing partitions. New ceilings & finishes as per plans filed here within. No change in use, egress, or occupancy.
INSTALLATION OF NON-ADVERTISING, NON-FLASHING AND ILLUMINATED BUSINESS ACCESSORY SIGN FOR BAKERY STORE OF FRONT FACADE AT 1ST FLOOR LEVEL ON STREET SIDE.
INSTALLATION OF NON-ADVERTISING, NON-FLASHING AND ILLUMINATED BUSINESS ACCESSORY SIGN FOR BAKERY STORE OF FRONT FACADE AT 1ST FLOOR LEVEL ON BROADWAY.
INSTALLATION OF NON-ADVERTISING, NON-FLASHING AND ILLUMINATED BUSINESS ACCESSORY SIGN FOR BAKERY STORE OF FRONT FACADE AT 1ST FLOOR LEVEL ON STREET SIDE.
Removal of existing plumbing fixtures and associated piping on the 32nd floor (LL- Demo & Whitebox) as per plans. No change to use, egress or occupancy.
Removal and disposal of interior partitions, doors, ceilings and finishes with patch and repair of walls and columns on the 32nd Floor (LL- Demo & Whitebox) as per plans. No change to use, egress or occupancy.