VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
ERECT APPROX.331LFT IN TOTAL OF CONSTRUCTION TIGHT BOARD FENCE APPROX 130LFT ALONG THE FRONT EXP#1 ON GRAND CONCOURSE APPROX.130L/FT ALONG THE REAR OF THE PREMISES(EXP#3)ANTHONY AVENUE AND, APPROX.71L/FT ALONG THE RIGHT SIDE OF FIRE BLDG (EXP#4) IN BTWN ADJOING PREMISES AT THE FIRE PASSAGE WAY TO SAFEGUARD THE PUBLIC AND PROPERTY
EMER WORK.BLDG SUFFRD A5-ALARM FIRE ON 3/5/23&SUSTAINED SEVERE STRCTRL DAMAGE.THERE'S A PARTY WALL@EXP2(NORTH)&INDEPENDENTWALL@EXP4 WAS DMGD BY STEEL FRMNG CLLPSES.PERMITER WALLS UNBRACD.1.IMMED FULLY DEMO BLDG UNDR DRCT SPRVSN&DRECTION OF ONSITE PE STRCTRL ENGNEER W/ALL WRK PRFRMD BY DEMO ENDRSD CNTRCTR
EMER WORK.BLDG SUFFRD A 5-ALARM FIRE ON3/5/23&SUSTAINEDSEVERE STRCTRL DMGE.ENTRE ROOD CLLPSD W/SOME UNSTBLE STEEL FRMINGREMAINING PRTLLY CLLPSD.RMAINING MSONRY WALLS UNBRACED W/AREAS OF DMGE.1.IMMED INTALL TGHTBOARD FENCE@EXP1TO CLOSE SDEWALK/SERVICE ROAD ON GRAND CONCOURSE& @EXP3 TO CLOSE OFF PRKING LANE@ANT
STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE AND FIRE FIGHTING OPERATION - FULL VACATE DUE TO A FIRE WITH TOTAL COLLAPSE OF THE ROOF
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT