Installation of temporary fence for NYCDEP Contract # GI-CONS-3
RETROFIT EXISTING SCHOOLYARDS TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGE STORMWATER RUNOFF FROM THE TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GI PROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
RETROFIT EXISTING SCHOOLYARDS TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGE STORMWATER RUNOFF FROM THE TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GI PROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
Mechanical work associated with the replacement of 3 Existing boilers , new Breeching, Dampers, chemical feeds , Steam valves and traps, new exhaust fans,1 new Split A/C unit. new refrigerant piping Ductwork Chimney Liner. As per plans.
Provide temporary sidewalk & bridging & fencing. Removal of 1 Window & provide a new Louver . Replace existing fire rated interior doors with hardware .provide an out door gas meter enclosure. provide a new fire rated wall by pool equipment room.
RICHMOND HILL HS: PROPOSED CONSTRUCTION FENCE FOR MODIFICATIONS TO AN EXISTING SCHOOL BUILDING. FENCE FILED IN CONJUNCTION WITH DOB APPLICATIONS Q00699936, 421902285, 421902640 AND ALL RELATED APPLICATIONS.
Remove and replace gas services with high pressure , new curb valve box , new secondary RPZ, New Hot water heater. Replace Hot ,Cold & gas piping New out door gas meter assembly and enclosure , as per plans filed herewith.
Existing pool upgrade, provide new cold water piping, Filters , valves, circulation pumps, water sensors, overflow tank sand chemical treatments and associated piping. As per plans .
Installation of new condensing hot water boiler for heating pool water through heat exchanger.
Remove 3 existing oil fired boilers and replace with 3 new gas fired boilers with boiler feed and other associated parts .
Supported Scaffold at Richmond Hill HS Courtyard
Replace two existing fountains with new ADA compliant double drinking fountains each and related plumbing lines at Fourth Floor Corridor. - NO CHANGE IN USE - NO CHANGE IN OCCUPANCY - NO CHANGE IN EGRESS - NO CHANGE IN VENTILATION
RENOVATE EXISTING LIBRARY IN ROOM 404 - ADD NEW INTERIOR NON-STRUCTURAL GLAZED PARTITION - NO CHANGE IN USE - NO CHANGE IN OCCUPANCY - NO CHANGE IN EGRESS - NO CHANGE IN VENTILATION
Replace damaged ductwork. Reconnection and sealing of existing ductwork joints. Clean out duct work.
Cleaning of existing pipes. Remove and replace roof drains.
Roof playground slab replacement and architectural, mechanical, plumbing, and electrical associated work.
Filing for installation of sidewalk shed on behalf of contractor
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO OBEY VACATE ORDER FROM THE COMMISSIONER