1 4 PLACE, Brooklyn, NY, 11231 · New York City · 13 total events
Remove, replace conc. pavement, replace brick pavers with concrete, grate and mounting with galv. steel grating, deteriorated brick stairs with concrete stairs, install handrails, repair chain link and iron fences, rebuild retaining walls.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR HS 505Q AT 160-05 HIGHLAND AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Filing for support of excavation. No change in use, egress or occupancy.
Provide insulated copper condensate drain for new walk-in freezers on the third and fourth floors. Install refrigerant lines between evaporators for walk-in freezers and outdoor condensing units.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 160-05 HIGHLAND AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
removal of finishes to accommodate removal & installation of (2) new walk-in freezers & finishes at 3F & 4F existing kitchens in existing locations & installation of new condensers at roof above, roof patching & re-flashing at equipment rails.
Q505-CTF Room Conversion - Provide new steam-fed unit ventilator new valves with associated temperature controls, piping and electrical connections. Installation of new exhaust fan with associated ductwork and grilles.
Q505 - Hillcrest - CTF - Nursing/EMT Room - Remove five (5) existing Lavatories, provide new fixtures (ADA complaint) and install new domestic and sanitary piping and components.
Provide insulated copper condensate drain for new walk-in freezers on the third and fourth floors. Install refrigerant lines between evaporators for walk-in freezers and outdoor condensing units.
Provide insulated copper condensate drain for new walk-in freezers on the third and fourth floors. Install refrigerant lines between evaporators for walk-in freezers and outdoor condensing units.
Herewith filing for a Post Approval Amendment
Herewith filing for a Post Approval Amendment
CTF Room Conversion 458, 460 and 462 involves demolition, removal of F/E , flooring, painting these spaces will be combined. New VCT flooring w/base walls and ceiling replaced and painted new SCA Furniture and equipment installed.