1 4 PLACE, Brooklyn, NY, 11231 · New York City · 42 total events
HEREWITH FILING FOR STRUCTURAL MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
HEREWITH FILING FOR MODIFICATIONS TO THE EXISTING MECHANICAL SYSTEM ON THE FLOOR. NO CHANGE TO USE OCCUPANY OR EGRESS.
HEREWITH FILING FOR INTERIOR RENOVATION ON THE ROOF AS PER PLANS. NO CHANGE TO USE OCCUPANCY RO EGRESS.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PROPOSED PLUMBING WORK TO REPAIR FIXTURES, AND SPRINKLER WORK TO INSTALL, RELOCATE, REMOVE EXISTING HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL AS PER PLANS FILED HEREWITH.
PROPOSED PLUMBING WORK TO REPAIR FIXTURES, AND SPRINKLER WORK TO INSTALL, RELOCATE, REMOVE EXISTING HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL AS PER PLANS FILED HEREWITH.
HHC Queens Hospital Center Proposed interior renovation of an MRI on Cellar floor. no change in use, egress or occupancy. All as per plans filed herewith.
HHC Queens Hospital Center Proposed Mechanical-HVAC-Lighting work interior renovation of an MRI on cellar Floor. no change in use, egress or occupancy. All as per plans filed herewith.
FILING HEREWITH FOR THE ANCHORAGE FOR TABLE BASE AT CELLAR FLOOR.SUPPORT FOR OVERHEAD MEDICAL EQUIPMENT.
Filing herewith for the installation of new aquilion exceed LB X-ray and equipment at existing X-ray Suite. NO change to use, egress, or occupancy
Filing herewith for HVAC Unit installation:
Related sprinkler modification for a portion of the 4 fl N building. PAA1 description in comments
FILING FOR INSTALLATION OF COMMERCIAL KITCHEN RANGEHOOD VENTILATION SYSTEM FOR CAFE AT QUEENS HOSPITAL CENTER. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
FILING HEREWITH TO RELOCATE EXAMINATION SINK. EXTEND MEDICAL GASES FROM EXISTING TO NEW AREA OF WORK.THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY .
Filing herewith to remove existing sprinkler branch lines and associated heads back to main and extend new branch lines to new area of work to fee new sprinkler heads
Filing herewith for the renovation to include miscellaneous partitions, minor plumbing, electrical and hvac at cellar level. There is no change to use, egress, or occupancy.
Filing herewith for the modifications to existing mechanical systems and associated duct piping
Install 125 kW diesel powered emergency generator on grade level with 740 gallon belly tank.
Related HVAC work for a portion of the 4 fl N building renovation. PAA1 description in comments
Interior renovation of a portion of the 4th floor N building including removals of existing nonbearing partitions, ceiling and finishes and construction of new walls, ceilings, doors, floors and finishes. PAA1 description in comments
Related plumbing for portion of 4 floor N building renovation. PAA1 description in comments
Plumbing modification on a portion of the 4floor for Behavioral Health Integration. Piping changes - 3 floor ceiling
Modification to existing plumbing as related to replacement of cooling unit in data center in basement. No change in use, egress, or occupancy.
Replacement of cooling unit with related dunnage work in basement data center as per plans. No change in use, egress, or occupancy.
Herewith filing for Reinforcement of the existing framing slab from above ( OR # 4) by adding more shear studs to the existing beams to support Robotic Da Vinci medical equipment. as per the drawings. No change in use, egress or occupancy.
Plumbing work for the installation of two (2) heat pump domestic hot water heaters (along with all associated equipment, piping, and accessories) in the mechanical room located in the basement of N Building.
Sprinkler modification on a portion of the 4floor for Behavioral Health Integration.
Partition modification on a portion of the 4floor for Behavioral Health Integration
HVAC modification on a portion of the 4floor for Behavioral Health Integration.
INSTALLATION OF TEMPORARY SUPPORTED SCAFFOLDING AT EXTERIOR FACADE (+/-50'H) AND ROOF BULKHEAD (+/-12'H), AS PER PLANS, FOR FACADE REPAIRS AND ROOF REPLACEMENNT WORK.. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Proposed facade repairs and roof replacement for Building S of Queens Hospital
INSTALLATION OF APPROXIMATELY +/- 440LF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS, FOR PUBLIC PROTECTION FOR FACADE REPAIRS AND ROOF REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. PAA #1 - REVISED LAYOUT DRAWINGS.
INSTALLATION OF +/- 621 LF OF 8'-0H TEMPORARY CHAIN LINK CONSTRUCTION FENCE FOR PUBLIC PROTECTION FOR FACADE REPAIRS AND ROOF REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
HEREWITH FILING TO REPLACE (4) LIGHT POLES WITH STRUCTURAL BASE CABINETS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical work for the installation of two (2) heat pump domestic hot water heaters (along with all associated equipment, piping, and accessories) in the mechanical room located in the basement of N Building.
SF/NYCHA Queens Hospital BLDG N SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD) TO PROTECT PUBLIC FROM WORK AREAS .NO CHANGE IN USE, OCCUPANCY OR EGRESS
Replacement of existing domestic water heater in basement as per plans. No change in use, egress, or occupancy.
Minor demo and install work related to equipment for generator at basement, first, and OSP. No change in use, egress, or occupancy.
Mechanical modifications related to the replacement of domestic water heaters in basement as per plans. No change in use, egress, or occupancy.
FN/NYCHA Queens Hospital BLDG N SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (Fence) TO PROTECT PUBLIC FROM WORK AREAS .NO CHANGE IN USE, OCCUPANCY OR EGRESS
SH/NYCHA Queens Hospital BLDG N SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SHED) TO PROTECT PUBLIC FROM WORK AREAS .NO CHANGE IN USE, OCCUPANCY OR EGRESS
Install UV lights or PCO to reduce virus particles & disinfect the cooling coils; install or replace coils; replace existing humidifiers; convert filters to electronic. Dental area; portable HEPA units with UVGI & bi polar ionization. See Comments for PAA