1 4 PLACE, Brooklyn, NY, 11231 · New York City · 6 total events
THE INTENT OF THIS PROJECT IS TO REPLACE THE EXISTING AC UNIT AND INSTALL BNEW BASE BUILDING MANAGEMENT SYSTEM (BMS) TO SERVER THE LIBRARY SPACE. THE NEW ROOFTOP AC UNIT IS TO BE LOCATED ON THE ROOF WITHIN A NEW ACOUSTICAL SCREEN ENCLOSURE.
STRUCTURAL DUNNAGE IN CONJUNCTION WITH NEW ROOFTOP AC UNIT
PROPOSED GAS PIPING IN CONJUNCTION WITH HVAC UPGRADE TO EXISTING FACILITY FROM 1ST FLOOR TO ROOF LEVELS.
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST