1 4 PLACE, Brooklyn, NY, 11231 · New York City · 15 total events
sump pump replacement in the Digester building.
General structural construction associated with equipment replacement in existing buildings.
General structural construction associated with equipment replacement in existing buildings.
NEW OPEN PARKING AND MODIFICATIONS TO BUILDING EGRESS.
HVAC system installation, Contract TI-168 to rehabilitate & upgrade the headworks of the Tallman Island WRRF. Systems comprise of heating & ventilation units, exhaust fans, hot water coils, hydronic pumps/piping, ductwork, standby generator, controls.
Plumbing work related to Contract TI-168 to rehabilitate and upgrade the headworks of DEP Tallman Island Wastewater Resource Recovery Facility.
Replacement of existing HVAC equipment.
Installation of temporary platform. Platform shall comply with NYC DOB BC 2022. No change in use, egress, or occupancy.
Tallman Island WRRF - Dewatering Building. Scope of work: extend air vent pipe above flood protection line (FPL); reroute one process pipe above FPL; extend one fire standpipe; demolish eyewash station, and reroute sanitary line through reinforced wall.
Proposed: replacement in the same location of 2 gas RTU units (RTU#3 and RTU#4) and associated duct work on top of the roof. No change of use, egress or occupancy,
PROPOSED: RENOVATION OF THE EXISTING LOCKER ROOMS, BATHROOMS AND CAFETERIA AREA. NO CHANGE OF USE, EGRESS OR OCCUPANCY
Proposed: plumbing work in conjunction with locker rooms, bathrooms and cafeteria area renovations and gas plumbing work in conjunction with the replacement in the same location of 2 gas RTU units (RTU#3 and RTU#4). No change of use, egress occupancy
Tallman Island WRRF - Storage Building. NYCDEP Flood resiliency work includes installation of sump pumps and associated drain piping and installation of manhole inline check valves.
Tallman Island WRRF - Grit Building & North/South Thickener Buildings. Plumbing scope of work is to replace two sump pumps in-kind, and raise air vent above Design Flood Elevation.
Proposed: Replacement of corroded gas pipe in existing location. No change of use, egress occupancy