General construction alterations for construction of vehicular sally port and officer's booth at the ground floor; related work as per plans. No proposed change in building use, egress, or occupancy.
INSTALLATION OF APPROXIMATELY +/- 922LF OF TEMPORARY SIDEWALK SHED, AS PER PLANS, FOR PUBLIC PROTECTION. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Installation of suspended scaffold for facade work or inspection.
General construction and structural alterations on the 1st thru 6th floors for proposed replacement in-kind of steel brackets supporting existing screen wall. No proposed exterior work; no proposed change to building, use, egress, or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing alterations at the cellar level for proposed replacement of ex. domestic water DCVA with new backflow prevention devices/assemblies and accessories; related work as per plans. No proposed change in building use, egress, or occupancy.
Site Fence to capture project site - NYC Borough Based Jail - Queens Facility.
General construction alterations for construction of interim facade in conjunction with decoupling from & partial demolition of detention center under BIS Job# 421791449. No proposed change in building use, egress, or occupancy.
Mechanical systems alterations at the ground floor & cellar level for proposed construction of vehicular sally port and officer's booth; related work as per plans. No proposed change in building use, egress, or occupancy.
Structural alterations for construction of interim facade in conjunction with decoupling from & partial demolition of detention center under BIS Job# 421791449. No structural demolition work is to take place under this application.
Proposed new 9-story parking facility with cellar (218,083 gross sf; 612 parking spaces) and 2-story community space with cellar (29,231 gross sf).
(Queens Criminal Court House) Provide and Install 3 new backflow preventers, (2 RPZ, 1 DCDA). New duplex booster pump set with storage tank. New 4 CW main from the cellar & 1st thru 4th floors.
REMOVAL OF SPRINKLER SYSTEM FROM FLOORS CELLAR, 001-008. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
MODIFICATION OF EXISTING WET STANDPIPE SYSTEM TO A DRY PRESSURIZED SYSTEM. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
INSTALLATION OF A TEMPORARY ACCESS SCAFFOLD AS PER PLANS IN CONJUNCTION WITH FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGES IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33
INSTALLATION OF A TEMPORARY PERSONNEL/MATERIAL HOIST COMPLEX AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
Curb Cut filed in conjunction with New Building (Q00495324) and Builders Pavement Plan (440692626): 35' garage entrance at South side of 132nd Street.
Curb Cut filed in conjunction with New Building (Q00495324) and Builders Pavement Plan (440692626): ~35 curb ramp at Southwest intersection of Union Turnpike & 126th Street.
Curb Cut filed in conjunction with New Building (Q00495324) and Builders Pavement Plan (440692626): 31' curb restoration at North side of 126th Street (removal of ex. curb ramp).
Curb Cut filed in conjunction with New Building (Q00495324) and Builders Pavement Plan (440692626): 35' restoration of curb at North side of 126th Street (removal of ex. driveway).
Curb Cut filed in conjunction with New Building (Q00495324) and Builders Pavement Plan (440692626): 35' garage entrance at North side of 126th Street.
INSTALLATION OF TEMPORARY FLOOR SHORING POSTS IN ASSOCIATION WITH FULL BUILDING DEMOLITION. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION
Filing plans to install new temporary retaining wall, in conjunction with Demo Permit # 421791449
Plumbing, sprinkler & standpipe alterations for proposed 9-story parking garage w. cellar & 2-story community facility w. cellar. All permanent sprinkler & standpipe fixtures throughout building will be installed under this application.
Plumbing, sprinkler & standpipe alterations for proposed 9-story parking garage w. cellar & 2-story community facility w. cellar. All permanent sprinkler & standpipe fixtures throughout building will be installed under this application.
Installation of temporary standpipe system in conjunction with construction of New Building (Job# Q00495324); related work as per plans.
Mechanical systems alterations related to construction of new 9-story parking garage with cellar and 2-story community facility with cellar; related work as per plans.
INSTALLATION OF CONSTRUCTION FENCE TO ENCLOSE SITE AS PER NYC BC. NO CHANGE IN USE, EGRESS. OR OCCUPANCY UNDER THIS APPLICATION.
INSTALL EXTERIOR ILLUMINATED WALL SIGN (BOROUGH HALL MUNICIPAL GARAGE)
INSTALL EXTERIOR ILLUMINATED WALL SIGN (BOROUGH HALL MUNICIPAL GARAGE)
Construction of timber debris chute, to lower demolition debris from slab opening on the top of bldg to 8th flr platform. Debris will be moved from 8th flr & will use existing elevator shafts as debris chutes onto 1st flr platform and load out offsite.
Installation of fuel storage tank at the 1st floor in conjunction with emergency generator installation included under Mechanical Systems Filing# Q00495324-S2; related piping and accessories as per plans.
TEMPORARY PLACEMENT OF A SPYDERCRANE URW205 AND/OR 295-1 TO HOIST AND ERECT STRUCTURAL STEEL
Plumbing alterations for proposed storm water detention system in conjunction with New Building.
USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPRATELY UNDER Q00495324
Temporary support-of-excavation for proposed 6' excavation in conjunction with proposed decoupling scope.
APPLICATION FOR THE INSTALLATION OF SUSPENDED FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY
(Queen Criminal Court DA Building ) HVAC: Cut and cap existing 8 low pressure steam feeding the detention center and condensate return lines. Cut and cap 4 high pressure steam line. Provide new 2-1/2 condensate pipe line.
Plumbing alterations at the ground floor for proposed construction of vehicular sally port; related work as per plans.
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
Temporary support-of-excavation for proposed 6' excavation, in conjunction with proposed vehicular sally port.
Structural & foundation alterations at the ground floor for proposed construction of vehicular sally port; related work as per plans. No change in building use, egress, or occupancy.
Structural & foundation alterations at the ground floor for proposed construction of vehicular sally port; related work as per plans. No change in building use, egress, or occupancy.
Structural & foundation alterations at the ground floor for proposed construction of vehicular sally port; related work as per plans. No change in building use, egress, or occupancy.
Plumbing alterations related to installation of plumbing fixtures, storm detention tank, sewage ejector pit, storm drainage & piping related to proposed New Building foundation; related work as per plans.
Disconnection of existing Standpipe service from adjacent soon to be demolished building and addition of new water services and fire pump to serve existing standpipe system and future LL26 upgrade.
excavation for the installation of 4 new pipe lines 2 from 132 nd side of building & 2 from the Hoover street side of building. repair and replace all grounds work to original state.