1 4 PLACE, Brooklyn, NY, 11231 · New York City · 14 total events
Reconstruction of a retaining wall and compactor pad, NYPD Mounted Troop F, 198-15 Grand Central Parkway, Hollis, Queens, submitted by the New York City Police Department, approved by NYC Design Commission. No change in use, egress, or occupancy
Mechanical application file in-conjunction with alt. 2 application.
Plumbing application file in-conjunction with the alt. 2 application.
Sprinkler application filed in conjunction with the alt. 2 421764763.
INSTALL TEMPORARY CONSTRUCTION FENCE THROUGHOUT PROPERTY IN CONJUCTION WITH APPLICATION # 421764763
EMPTY PURGE, CLEAN, & PROPERLY CLOSE IN-PLACE ONE (1) 2,500-GALON UST & ASSOCIATED PIPING & LEAK DETECTION SYSTEM COMPONENTS. INSTALL ONE (1) 2,500-GALON B5/B20 BIOFUEL UST, & ALL ASSOCIATED PIPING AND LEAK DETECTION SYSTEM.
INSTALL NEW FUEL DISPENSING ISLAND CANOPY STRUCTURE AND FOUNDATIONS AS PER PLANS.
Propose to file for support of excavation. No change to use, egress or occupancy.
INSTALL A INTERLOCKING STEEL SHEET PILE SUPPORT OF EXCAVATION SYSTEM TO FACILITATE THE UNDERGROUND FUEL STORAGE TANK REPLACEMENT ON SITE
REMOVE/DISPOSE (3) 4,000-GAL. MOTOR VEHICKLE USTS, FUEL ISLAND, CANOPY, PIPING & LEAK DETECTION SYSTEM. INSTALL (1) 2,500-GAL. & (2) 5,000-GAL. GASOLINE USTS & (1) 4,000-GAL.S BIODIESEL UST, FUEL ISLAND, CANOPY,PIPING & LEAK DETECTION SYSTEM AS PER PLANS.
INSTALL APPROXIMATELY 359 LINEAR FEET OF 8 FOOT HIGH TEMPORARY PLYWOOD CLAD CONSTRUCTION FENCE ON PAVEMENT IN ACCORDANCE WITH N.Y.C.B.C. SECTION 3307.7
GENERAL CONSTRUCTION AND STRUCTURAL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF (1) BIODIESEL UST SYSTEM (EXCAVATION, BACKFILL, REINFORCED CONCRETE WORK, SITE RESTORATION, ETC.).
GENERAL CONSTRUCTION AND STRUCTURAL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF (1) BIODIESEL UST SYSTEM (EXCAVATION, BACKFILL, REINFORCED CONCRETE WORK, SITE RESTORATION, ETC.).
SUPPORT OF EXCAVATION WORK FILED HEREWITH