1 3 STREET, Brooklyn, NY, 11231 · New York City · 128 total events
INSTALLATION OF TWO (2) NEW ROOFTOP HVAC UNITS THAT CONNECT TO THE EXISTING SUPPLY / RETURN INFRASTRUCTURE. THERE IS A NEW FITOUT LEVEL AIR DISTRIBUTION NETWORK ON LEVEL 4, WHICH INCLUDES SUPPLY / RETURN DUCTWORK AND AIR TERMINAL UNITS FOR THE FUTURE TENA
Hereby filing installation of sump pump and related piping in relation to elevator rehabilitation per plan filed herewith. Related application# 321575620, B01082570
Hereby filing modification to existing HVAC system for tenant improvement. No change to use, egress or occupancy
Hereby filing modification to an existing sprinkler and standpipe system per plans filed herewith.
Hereby filing modification to an existing sprinkler and standpipe system per plans filed herewith.
INSTALLATION OF CONCRETE ENCASEMENT FOR FUEL OIL PIPING & FIRESTOPPING AS PER PLANS
HEREBY FILING MODIFICATION OF EXISTINGSPRINKLER SYSTEMS ON LEVEL 4, AND THE ADDITION OF FIRE STANDPIPEHOSE VALVES TO PROVIDE FULL COVERAGE. THERE ARE NO NEWLYPROPOSED WATER SERVICES, FIRE PUMPS, OR SPRINKLER BOOSTER PUMPS
HEREBY FILING MODIFICATION OF EXISTINGSPRINKLER SYSTEMS ON LEVEL 4, AND THE ADDITION OF FIRE STANDPIPEHOSE VALVES TO PROVIDE FULL COVERAGE. THERE ARE NO NEWLYPROPOSED WATER SERVICES, FIRE PUMPS, OR SPRINKLER BOOSTER PUMPS
RENOVATION OF AN EXISTING HISTORIC BUILDING, UNDER THE OWNERSHIP OF NYC EDC, TO PROVIDE SHELLSPACES FOR FUTURE COMMERCIAL TENANT OCCUPANCY. THE PROPOSED WORK INCLUDES THE MODIFICATION OF EXISTING PLUMBING SERVICES ON LEVELS 3-4 TO FACILITATE NEW TENANTS..
PROPOSED NEW PLUMBING FIXTURES, NEW SPRINKLER HEADS AND RELOCATE EXISTING SPRINKLER HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Hereby filing pluming modification for tenant improvement,
HEREBY FILING INSTALLATION OF NEW PLUMBING FIXTURES ON LEVELS 3-8, AS WELL AS NEW ELEVATOR SUMP PUMPS ON THE BASEMENT LEVEL. THERE ARE NO NEW WATER SERVICES OR SEWAGE PUMPS PROPOSED.
Interior plumbing replacement for existing tenant space
REPLACE THE EXISTING PANASONIC AC SPLIT SYSTEM WITH A NEW MITSUBISHI OR EQUAL SPLIT AC SYSTEM WITH ALL THE REFRIGERANT LINES, ACCESSORIES AND CONTROLS IN THE MACHINE ROOM OF PASSENGER ELEVATOR PE-9. AS SPECIFIED IN THE PROJECT CONTRACT DRAWINGS
Hereby filing general construction work related to elevator PE-9 rehabilitation. No change to use, egress, or occupancy
SCOPE OF WORK INCLUDES BUILDING A PHASE 5 LEVEL 4 AND ROOF LEVEL, INCLUDING STEEL DUNNAGE FOR MECHANICAL EQUIPMENT.
ENTIRE BUILDING
Interior MH duct work replacement only.
Tenant fit out of existing space
HEREWITH FILING FOR TENANT IMPROVEMENTS ON CENTER AREA OF LEVEL 4INVOLVING INSTALLATION OF NEW WALLS, PARTITIONS, CEILINGS, DOORS, LIGHTINGAND RELATED EQUIPMENT. TENANT IMPROVEMENTS ON ROOF INCLUDE NEWMECHANICAL EQUIPMENT AND SUPPORT DUNNAGE WITH RAILINGS
Hereby filing tenant improvement and elevator renovation as per plans herewith. No change to use, egress, or occupancy
TEMPORARY ROOF PROTECTION AS PER DRAWINGS. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
installation of 3 RPZ
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Replacement of (2) air cooled condensing units on the roof on existing curbs. All existing ductwork to remain. No change in use egress and occupancy.
PLANS FOR THE REMOVAL AND REPAIR OF ASPHALT, CONCRETE PAVEMENT AND CURB TO ALLOW FOR THE INSTALLATION OF BACKFLOW PREVENTION ENCLOSURES.
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
Apt BUILDING A,UNIT 3L — Possession
ENTIRE BUILDING
Modify existing sprinkler system at the 4th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
ENTIRE BUILDING
Apt BUILDING A, UNIT 3K — Possession
INSTALLATION OF NEW COMMERCIAL DISHWASHER WITH ASSOCIATED PLUMBING SYSTEMS AS PER PLANS
General Construction to Renovate existing manufacturing space at 7th floor indicated on drawings filed herewith. No change in use egress or Occupancy under this application
Modify existing sprinkler system at 7th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
Install plumbing fixtures at 7th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
HEREBY FILING FOR INTERIOR FITOUT FOR UNIT #403. NO CHANGE TO OCCUPANCY, USE, NOR EGRESS.
Temporary structures for a Teksupport event in the Brooklyn Army Terminal pier. Removed at the end of the programing. No changes to existing structures, use or egress.
Installation of a new electric ceramics kiln and associated exhaust fan as per plans submitted.
Interior Renovation of Existing Tenant Manufacturing Space. No Change in Use. Egress or Occupancy
SP modification at FIRST FL as per plans
PL fixtures, piping, drains and vents related to work for lobby, corridor & restroom renovation
Interior renovation to First Fl Lobby, corridors, restrooms. Addition of loading docks as indicated on plans
Install 2 temporary platforms comprised of modular staging units. Platforms to be in place for 8/31/24 - 9/1/24 event only. Location is on Pier 4, an OSP outdoor space. Filed in conjunction w/ TPA #B01094831-I1 for temp. A2 use.
Temporary Installations to be used on a temporary event Black Book. All the Installations are to be removed upon completion of the event.
General Construction at 4th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
Mechanical work for ductwork at 4th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
Renovation of existing commercial space on floor 002. Architectural work. There is to be no change of use, occupancy, or egress.
INSTALLATION OF NEW PLUMBING FIXTURES AND REPLACEMENT OF EXISTING FIXTURES AS PER PLANS FILED HEREWITH.