1 3 STREET, Brooklyn, NY, 11231 · New York City · 64 total events
HEREWITH FILING FOR SPRINKLER AND STANDPIPE MODIFICATIONS FOR THE TOWER BUILDING AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
PROPOSED GENERAL CONSTRUCTION FOR INTERIOR RENOVATION ON THE EIGHTH FLOOR. ALL AS PER PLANS FILED HEREWITH
Proposed mechanical work associated with the interior renovation on the 8th floor of South Brooklyn Health Hospital.
SPRINKLER AND STANDPIPE WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR SUE.
SPRINKLER AND STANDPIPE WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR SUE.
HEREWITH FILING FOR SPRINKLER AND STANDPIPE MODIFICATIONS FOR THE TOWER BUILDING AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
PROPOSED PLUMBING WORK RELATED TO THE INTERIOR RENOVATION ON THE EIGHTH FLOOR OF SOUTH BROOKLYN HEALTH HOSPITAL. ALL AS PER PLANS FILED HEREWITH
PROPOSED SPRINKLER FILING FOR INTERIOR RENOVATION ON THE EIGHTH FLOOR OF THE SOUTH WOMEN'S HEALTH HOSPITAL. ALL AS PER PLANS FILED HEREWITH
Proposed selective removal on part of the 8th floor wing, in connection with an interior renovation at NYC H+H SOUTH BROOKLYN HEALTH HOSPITAL.
Proposed selective removal on part of the 8th floor wing, in connection with an interior renovation at NYC H+H SOUTH BROOKLYN HEALTH HOSPITAL.
FILING FOR REMOVAL OF EXISTING STAIRCASE AND CONNECTION TO NEW CSS BUILDING (320911171) AS SHOWN HEREWITH.
Herewith filing mechanical modifications for Out-Patient Infusion Center at South Brooklyn Health. No change to use, egress, or occupancy.
Herewith filing general construction modifications for Out-Patient Infusion Center at South Brooklyn Health. No change in use, egress, or occupancy.
Herewith filing plumbing modifications for Out-Patient Infusion Center at South Brooklyn Health. No change in use, egress, or occupancy.
FILING FOR DETENTION TANKS AND ASSOCIATED DRAINS & PIPING IN CONJUNCTION TO NB APP # 320911171 AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
HEREWITH FILING FOR PLUMBING MODIFICATIONS ON THE TOWER BUILDING AS PER PLANS. NO CHANGE IN USE, EGRESS OCCUPANCY.
HEREWITH FILING FOR MECHANICAL MODIFICATIONS ON THE TOWER BUILDING AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
HEREWITH FILING CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING FOR CONEY ISLAND HOSPITAL.
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
TEMPORARY OVERHEAD PROTECTION DURING BUILDING ALTERATION AT THE ADJACENT PROPERTY (2601 OCEAN PWAY) AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
HEREWITH FILING FOR INTERIOR PLUMBING AS SHOWN FOR THE TOWER BUILDING.
BB054: INSTALL NON-ILLUMINATED PEDESTRIAN DIRECTORY PANEL MOUNTED ON GRADE. (NYC HEALTH+ HOSPITALS SOUTH BROOKLYN HEALTH)
BB050: INSTALL NON-ILLUMINATED PEDESTRIAN DIRECTORY PANEL MOUNTED ON GRADE. (NYC HEALTH+ HOSPITALS SOUTH BROOKLYN HEALTH)
BB002: INSTALL NON-ILLUMINATED PEDESTRIAN DIRECTORY PANEL MOUNTED ON GRADE. (NYC HEALTH+ HOSPITALS SOUTH BROOKLYN HEALTH)
GG038: INSTALL NON-ILLUMINATED PEDESTRIAN DIRECTORY PANEL MOUNTED ON GRADE.
MECHANICAL WORK ASSOCIATED TO APPLICATION B00587068
Installation of Overhead Protection- OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
PAA application of DEMOLITION FOR FULL DEMOLITION OF 5 STORY HAMMETT BUILDING
PAA application for FULL DEMOLITION OF 1 STORY STRUCTURE
CONSTRUCTION FENCE AS PER DRAWINGS DURING BLDG DEMO. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
CONSTRUCTION FENCE AS PER DRAWINGS DURING BLDG DEMO. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
SUSPENDED SCAFFOLD INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
HEREWITH FILING FOR STRUCTURAL MODIFICATIONS ON THE TOWER BUILDING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
CONVERT STANDPIPE TO DRY TEMPORARY STANDPIPE NO CHANGE TO USE, OCCUPANCY OR EGRESS.
HEREWITH FILING FOR STRUCTURAL MODICIATIONS ON THE TOWER BUILDING AS PER PLANS.
HEREWITH FILING FOR MECHANICAL MODIFICATIONS ON THE 3RD FLOOR OF MAIN BUILDING AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
HEREWITH FILING MECHANICAL WORK AS INDICATED ON PLANS. NO CHANGE TO EGRESS USE OR OCCUPANCY
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF SIDEWALK SHED AND CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF SIDEWALK SHED AND CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Coney Island Hospital, 3rd Floor roofing repairs as per the plans filed including: Repair/removal & replacement of existing roofing system, brick masonry, concrete deck, parapet, drain and coping stone. Railing installation. Abate tar at spandrel beam.
herewith filing for high steam pressure boilers in conjunction to new building as per plans. no change in use, egress or occupancy.
INSTALLATION OF SIDEWALK SHED. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
HEREWITH FILING FOR SPRINKLER-STANDPIPE MODIFICATIONS ON THE MAIN BUILDING AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
FILING FOR TEMPORARY LOOP ON 2ND FLOOR FOR THE TOWER BUILDING ON THE CONEY ISLAND HOSPITAL.
HEREWITH FILING FOR PLUMBING MODIFICATIONS ON THE 3RD FLOOR OF THE MAIN BUILDING AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
DIRECT REPLACEMENT OF EXISTING AIR CONDITIONING UNITS IN INTERIOR COURT YARD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.