1 3 STREET, Brooklyn, NY, 11231 · New York City · 16 total events
Excavation of north facade. Repair, repointing, and waterproofing of foundation. Demolition and replace of areaways and stair. Infill permeable soil, grading, and landscaping. Replace sump pump, hoistway doors, and iron fence. PAA5 removes welding SI.
Excavation of north facade. Repair, repointing, and waterproofing of foundation. Demolition and replace of areaways and stair. Infill permeable soil, grading, and landscaping. Replace sump pump, hoistway doors, and iron fence. PAA5 removes welding SI.
P.S. 179-K: Removal and replacement of 6 drinking fountains and associated piping.
P.S. 179-K: Proposed Auditorium upgrade as part of Reso A - project. Upgrades include new seating & flooring, and refurbishing existing doors; new drinking fountains (3 at each existing Play/Lunch room), for a total of 6.
Excavation of north facade. Repair, repointing, and waterproofing of foundation. Demolition and replace of areaways and stair. Infill permeable soil, grading, and landscaping. Replace sump pump, hoistway doors, and iron fence. PAA5 removes welding SI.
Revised plumbing and architectural drawings to remove sump pump and special inspection for firestopping from scope of project.
Filing for excavation shoring installation on behalf of contractor
Filing for installation of temporary fence on behalf of contractor
COOKING GAS
GARBAGE/RECYCLING STORAGE
WATER SUPPLY
ENTIRE BUILDING
PESTS
WALL
Excavation of north facade. Repair, repointing, and waterproofing of foundation. Demolition and replace of areaways and stair. Infill permeable soil, grading, and landscaping. Replace sump pump, hoistway doors, and iron fence. PAA5 removes welding SI.
Filing for the installation of temporary fence on behalf of contractor